Lot
Information: Lot of about 3,571 m²
- Lot area: 3,571 m² · 0.88 acres · 38,438 sq ft (as stated in the parcel record)
- About 58.5 m wide and 75.7 m deep (estimated from the lot lines)
- Parcel type: Condominium
- Lot lines are approximate and not a survey.
Source: City of Toronto, Property Boundaries (2026-10-30). Public records; not a legal, zoning or engineering opinion.
Zoning
Information: Zoned CR · Commercial Residential
- Category: Mixed use
- Zone label: CR SS2 (x401)
- Zoning shown for reference only. The by-law text governs; confirm with the municipality.
Zoning by-law
Source: City of Toronto, Zoning By-law 569-2013 (open data) (2026-02-20). Public records; not a legal, zoning or engineering opinion.
Second units and garden suites
Limits apply: Additional units: not likely
- Unlikely
- Second unit: not likely · Third unit: not likely
- Garden suite: not likely · Laneway suite: not likely
- Up to 2 additional units per lot in this municipality
- Condominium parcel: additional units are not added to condominium common elements
- Screening from open data and the municipal by-law; not a zoning opinion. Confirm with the municipality.
Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-31); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, Toronto Centreline (public lanes) (2026-10-30); City of Toronto, Ravine & Natural Feature Protection area (2026-11-01); York Region, Parcel (property boundaries across York Region) (2026-11-01); York Region, Regional Official Plan 2022, Map 1 (Urban Area, Towns and Villages) (2026-11-01); Town of Newmarket, Zoning By-laws 2010-40 and 2019-06 (2026-10-10); Statistics Canada, 2021 Census census subdivisions (cartographic boundary file) (2026-11-01); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-11-01); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-11-01); Province of Ontario, Oak Ridges Moraine land use designations (2017 Plan) (2026-11-01); Province of Ontario, Greenbelt designations (2017 Plan) (2026-11-01). Public records; not a legal, zoning or engineering opinion.
Multiplex potential
Limits apply: Multiplex: apparently unsuitable
- Apparently unsuitable
- Not a residential zone
- Preliminary screening from open data. Not a zoning opinion or development approval. Confirm with the City and a qualified professional.
Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-30); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, City Wards (25-ward model) (2026-02-20); City of Toronto, Heritage Register (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-09-01); City of Toronto, Ravine & Natural Feature Protection area (last refreshed by the City Jul 23, 2019) (2019-07-23); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Severance potential
Limits apply: Severance: unlikely
- Severance unlikely
- Estimated frontage 58.5 m
- Lot area 3,571 m²
- Not a low-rise residential zone (R, RD, RS, RT or RM)
- Frontage is estimated from the lot lines, not surveyed.
- Approved severance: 4 Gilead Pl (90 m) · 2026-09-09 · file B0031/26TEY
- Approved severance: 48 Power St (280 m) · 2023-06-21 · file B0018/23TEY
- Approved severance: 335 Queen St E (460 m) · 2021-03-31 · file B0003/21TEY
- Needs Committee of Adjustment approval; not a planning opinion.
How severances work in Toronto
Source: City of Toronto, Property Boundaries (2026-10-30); City of Toronto, Zoning By-law 569-2013 (open data) (2026-02-20); City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Variance odds (Committee of Adjustment)
Favourable: 91% of 66 minor variances within 1 km approved (5 years)
- Within 1 km, last 3 years: 34 decisions: 91% approved (91% approved, 0% with conditions, 6% refused, 3% withdrawn)
- Within 1 km, last 5 years: 66 decisions: 91% approved (91% approved, 0% with conditions, 8% refused, 2% withdrawn)
- Ward 13, last 3 years: 105 decisions: 96% approved (96% approved, 0% with conditions, 2% refused, 2% withdrawn)
- Ward 13, last 5 years: 196 decisions: 95% approved (95% approved, 0% with conditions, 4% refused, 2% withdrawn)
- Typical time from application to decision: 16 weeks (median of 65)
- Named in the application (1 km, 5 years): parking 17 (94% approved); floor space index / gross floor area 6; building height 6; lot frontage / lot area 1; 47 name no category
- Conditions: 0 of 60 approvals within 1 km are recorded as conditional. The City's open data does not publish the conditions; read the decision.
- 14 Eastern Ave (60 m) · Approved 2026-05-06 · file A0020/26TEY
- 4 Gilead Pl (90 m) · Approved 2026-09-09 · file A0249/26TEY
- 4 Gilead Pl (90 m) · Approved 2026-09-09 · file A0268/26TEY · parking, lot frontage / lot area
- 29 Sackville St (90 m) · Approved 2024-08-14 · file A0512/24TEY
- 38 St Paul St (290 m) · Approved 2022-03-23 · file A1248/21TEY · parking
- Past decisions don't predict future ones; not a planning opinion.
Variance odds by categoryCity's Application Information Centre
Source: City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Flood, Moraine and Greenbelt
Favourable: Outside mapped flood and hazard areas
- Not within a conservation authority's mapped regulated area (flooding, erosion, wetlands). Mapping is approximate.
- Outside the Oak Ridges Moraine Conservation Plan area.
- Outside the Greenbelt Plan area.
Source: Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-04-29); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-10-31); Credit Valley Conservation, Generic Regulations Limit (2025) (2026-10-27); Central Lake Ontario Conservation Authority, CLOCA Regulated Areas (natural hazards regulation mapping, Nov 2025) (2026-10-31); Hamilton Conservation Authority, HCA Regulated Areas (O. Reg. 41/24) (2026-08-04); Province of Ontario, Oak Ridges Moraine: land use designations (Oak Ridges Moraine Conservation Plan, 2017) (2026-10-31); Province of Ontario, Greenbelt designations (Greenbelt Plan, 2017) (2026-10-31); Province of Ontario, Wetlands (Land Information Ontario): Provincially Significant Wetlands and other evaluated wetlands (2026-10-31); Province of Ontario, Areas of Natural and Scientific Interest (ANSI), life science and earth science (Land Information Ontario) (2026-10-31); Province of Ontario, Wooded Area (Land Information Ontario): mapped woodland cover, not a significance determination (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Water and sewer capacity
Information: Municipal water and sewer (no allocation published)
- City of Toronto: Toronto Water treats and distributes drinking water and collects and treats wastewater across the city. No servicing allocation system is published.
- Published figure: Not published
- Based on: City of Toronto, Toronto Water (2026-11-01)
- Public records; confirm with the municipality.
The report
Source: City of Toronto, City of Toronto, Toronto Water (2026-11-01); Province of Ontario (Land Information Ontario), Municipal Boundary – Lower and Single Tier (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Urban Area (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Towns and Villages (2026-11-01). Public records; not a legal, zoning or engineering opinion.
Transit and station areas
Favourable: In a station area · Cherry Street GO 460 m
- Nearest rapid transit or GO station: Cherry Street GO (Lakeshore East), 460 m in a straight line
- Inside the Corktown Protected Major Transit Station Area. Station area boundaries and density targets come from the Official Plan. Confirm with the municipality.
Source: City of Toronto, Merged GTFS – TTC Routes and Schedules (subway and LRT routes, their shapes and the stations they serve) (2026-11-01); Province of Ontario, Ontario Railway Network (ORWN) track and station, filtered to GO Transit (Land Information Ontario; 2016 attribute vintage) (2026-10-31); York Region, Regional Official Plan 2022, Map 10 – Rapid Transit Network (proposed subway service and stations) (2026-10-31); City of Toronto, Minister-Approved Major Transit Station Areas (MTSA and Protected MTSA delineations) (2026-02-03); York Region, Regional Official Plan 2022, Appendix 2 – Major Transit Station Areas (boundaries and minimum density targets) (2026-10-31); Durham Region, Regional Official Plan (2024 consolidation), Map 3 – Protected Major Transit Station Areas (2026-10-31); City of Brampton, Brampton Plan, Schedule 1B – Primary Major Transit Station Areas (2026-06-11). Public records; not a legal, zoning or engineering opinion.
Commute
Favourable: Union Station: under 20 min by car, under 20 min by transit
- To Union Station: under 20 min by car · under 20 min by transit
- To Highway 404 / 407: under 40 min by car · over 60 min by transit
- Typical weekday morning, estimated from open road and transit schedule data (not live traffic or a trip planner).
Source: LSG commute estimate, Roads © OpenStreetMap contributors (ODbL); LSG commute estimate, TTC schedules: City of Toronto, Open Government Licence – Toronto; LSG commute estimate, Data used in this product or service is provided with the permission of Metrolinx. Public records; not a legal, zoning or engineering opinion.
Schools nearby
Information: Nearest elementary school: St Paul Catholic School, 280 m
- Inglenook Community School (Secondary, 70 m) · Toronto DSB
- St Paul Catholic School (Elementary, 280 m) · Toronto CDSB
- Nelson Mandela Park Public School (Elementary, 540 m) · Toronto DSB
- Market Lane Junior and Senior Public School (Elementary, 560 m) · Toronto DSB
- SEED Alternative School (Secondary, 1.2 km) · Toronto DSB
- St Michael's Choir (Sr) School (Secondary, 1.5 km) · Toronto CDSB
- The nearest school is not always the one that serves an address: use the board's locator. Boundaries change; confirm with the board.
TDSB school locator (Toronto District School Board)TCDSB school locator (Toronto Catholic District School Board)
Source: Ontario Ministry of Education, Ontario public school contact information (placed by Statistics Canada ODA addresses). Public records; not a legal, zoning or engineering opinion.
Parks
Favourable: Nearest park: Sackville Playground, 120 m
- 22 parks and green spaces within 800 m
Source: City of Toronto, Green Spaces (2026-10-27); City of Brampton, Parks (2026-10-19); City of Brampton, Recreational Trails (2026-10-19); City of Ottawa, Parks and Greenspace (2026-10-31); OpenStreetMap, Parks, nature reserves and conservation areas (2026-10-29); OpenStreetMap, Named paths, trails and cycleways (2026-10-29). Public records; not a legal, zoning or engineering opinion.
Child care
Information: 12 licensed child care centres within 1 km
- Nearest: Eyet Early Learning Centre (Tom'S Place) (280 m) · 80 Sackville Street, Toronto, ON M5A 3E5
- Licence status as of the ministry's latest monthly file. Ask the centre about spaces and fees.
Source: Ontario Ministry of Education, Licensed child care facilities in Ontario (2026-09-01). Public records; not a legal, zoning or engineering opinion.
Active development applications
Information: 31 active applications within 500 m
- Minor variance (Committee of Adjustment) · 21 Sackville St (80 m) · Postponed · A0717/26TEY
- Official plan and/or zoning by-law amendment · 4 Gilead Pl (90 m) · OMB Appeal · 26 141014 STE 13 OZ
- Site plan approval · 4 Gilead Pl (90 m) · Application Received · 26 145148 STE 13 SA
- Site plan approval · 1 Sumach St (and 9 more addresses) (230 m) · Under Review · 25 242829 STE 13 SA
- Official plan and/or zoning by-law amendment · 1 Sumach St (230 m) · Application Received · 26 239852 STE 13 OZ
- From the municipality's open data. Check the municipality's file for the latest status.
Official plan and/or zoning by-law amendment · 4 Gilead PlSite plan approval · 1 Sumach St (and 9 more addresses)
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Upcoming residential projects
Information: 51 upcoming residential projects within 1 km
- 4 Gilead Pl (90 m) · Proposed: 20-storey, 297-unit rental building
- 1 Sumach St (and 9 more addresses) (230 m) · Proposed: 1,284-unit mixed-use building, up to 59 storeys
- 281 Front St E (280 m) · Proposed: 1,065-unit apartment building, up to 54 storeys
- 130 Parliament St (and 2 more addresses) (340 m) · Approved: 46-storey, 419-unit mixed-use building
- 550 Adelaide St E (350 m) · Proposed: 29-storey, 240-unit mixed-use building
- From municipal open data. Not a listing or an offer to sell; details change. Confirm with the municipality.
4 Gilead Pl1 Sumach St (and 9 more addresses)281 Front St E
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Building permits nearby
Information: 22 building permits within 250 m since 2024
- New building · 373 Front St E (160 m) · 2026-10-21 · Revision Issued
- Addition / alteration · 373 Front St E (160 m) · 2026-08-04 · Inspection
- Addition / alteration · 489 King St E (120 m) · 2026-06-29 · Inspection
- Addition / alteration · 14 Eastern Ave (60 m) · 2026-06-18 · Revision Issued
- Addition / alteration · 373 Front St E (160 m) · 2026-03-19 · Inspection
- From the municipality's open data. Check with the municipality for the permit's current status.
Source: City of Toronto, Building Permits – Active Permits (2026-10-30); City of Toronto, Building Permits – Cleared Permits (2026-10-30); City of Mississauga, Building Permits (issued since 2018) (2026-10-01); City of Brampton, Building Permits (GeoHub) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Heritage
Favourable: No heritage status found
- Not found on the City's Heritage Register or in a Heritage Conservation District.
- Heritage status limits changes; confirm with the municipality.
Source: City of Toronto, Heritage Register (listed properties, and properties designated under Part IV or Part V of the Ontario Heritage Act) (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-06-23). Public records; not a legal, zoning or engineering opinion.
Official Plan
Not available: Official Plan designation not available here
Public records; not a legal, zoning or engineering opinion.
Contaminated sites
Favourable: No federal contaminated sites within 500 m
- From government records. Absence from this map doesn't mean a site is clean; get a Phase I ESA.
Source: Treasury Board of Canada Secretariat, Federal Contaminated Sites Inventory (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Neighbourhood profile
Information: Median household income $85k
- Median household income (2020): $85,000
- Owner households: 41%
- Households with children: 11%
- Median age: 35.6
- Population density: 10,437 per km²
- Statistics Canada, Census of Population 2021 (income is for 2020), for the dissemination area around this address.
Source: Statistics Canada, Census of Population 2021, Census Profile and dissemination area boundaries (2022-04-27). Public records; not a legal, zoning or engineering opinion.