Lot
Information: Lot of about 259 m²
- Lot area: 259 m² · 0.064 acres · 2,782 sq ft (as stated in the parcel record)
- About 6.7 m wide and 39.1 m deep (estimated from the lot lines)
- Lot lines are approximate and not a survey.
Source: City of Toronto, Property Boundaries (2026-10-30). Public records; not a legal, zoning or engineering opinion.
Zoning
Information: Zoned R · Residential
- Category: Residential
- Zone label: R (f4.5; d1.0) (x847)
- Zoning shown for reference only. The by-law text governs; confirm with the municipality.
Zoning by-law
Source: City of Toronto, Zoning By-law 569-2013 (open data) (2026-02-20). Public records; not a legal, zoning or engineering opinion.
Second units and garden suites
Favourable: Garden suite: likely allowed
- Likely allows additional units
- Second unit: likely allowed · Third unit: likely allowed
- Garden suite: likely allowed · Laneway suite: likely allowed
- Up to 2 additional units per lot in this municipality
- Screening from open data and the municipal by-law; not a zoning opinion. Confirm with the municipality.
Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-31); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, Toronto Centreline (public lanes) (2026-10-30); City of Toronto, Ravine & Natural Feature Protection area (2026-11-01); York Region, Parcel (property boundaries across York Region) (2026-11-01); York Region, Regional Official Plan 2022, Map 1 (Urban Area, Towns and Villages) (2026-11-01); Town of Newmarket, Zoning By-laws 2010-40 and 2019-06 (2026-10-10); Statistics Canada, 2021 Census census subdivisions (cartographic boundary file) (2026-11-01); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-11-01); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-11-01); Province of Ontario, Oak Ridges Moraine land use designations (2017 Plan) (2026-11-01); Province of Ontario, Greenbelt designations (2017 Plan) (2026-11-01). Public records; not a legal, zoning or engineering opinion.
Multiplex potential
Favourable: Multiplex: up to 6 units, potentially suitable
- Potentially suitable
- Up to 6 units under the City's multiplex rules (Sixplex Overlay)
- Preliminary screening from open data. Not a zoning opinion or development approval. Confirm with the City and a qualified professional.
Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-30); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, City Wards (25-ward model) (2026-02-20); City of Toronto, Heritage Register (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-09-01); City of Toronto, Ravine & Natural Feature Protection area (last refreshed by the City Jul 23, 2019) (2019-07-23); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Severance potential
Limits apply: Severance: unlikely
- Severance unlikely
- Zone R (f4.5; d1.0) (x847): minimum lot frontage 4.5 m
- Estimated frontage 6.7 m: 1.5× the minimum (two lots need 2×)
- Lot area 259 m²
- Frontage is under twice the zone's minimum
- Frontage is estimated from the lot lines, not surveyed.
- Approved severance: 82 Borden St (330 m) · 2022-11-02 · file B0032/22TEY
- Approved severance: 547 College St (430 m) · 2023-04-26 · file B0054/22TEY
- Approved severance: 104 Ulster St (470 m) · 2019-03-20 · file B0110/18TEY
- Needs Committee of Adjustment approval; not a planning opinion.
How severances work in Toronto
Source: City of Toronto, Property Boundaries (2026-10-30); City of Toronto, Zoning By-law 569-2013 (open data) (2026-02-20); City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Variance odds (Committee of Adjustment)
Favourable: 89% of 281 minor variances within 1 km approved (5 years)
- Within 1 km, last 3 years: 154 decisions: 87% approved (87% approved, 0% with conditions, 8% refused, 5% withdrawn)
- Within 1 km, last 5 years: 281 decisions: 89% approved (89% approved, 0% with conditions, 7% refused, 3% withdrawn)
- Ward 11, last 3 years: 480 decisions: 87% approved (87% approved, 0% with conditions, 8% refused, 5% withdrawn)
- Ward 11, last 5 years: 892 decisions: 89% approved (89% approved, <1% with conditions, 7% refused, 4% withdrawn)
- Typical time from application to decision: 13 weeks (median of 272)
- Named in the application (1 km, 5 years): garden or laneway suite 57 (88% approved); parking 24 (79% approved); floor space index / gross floor area 2; building height 1; 206 name no category
- Conditions: 0 of 251 approvals within 1 km are recorded as conditional. The City's open data does not publish the conditions; read the decision.
- 70 Lippincott St (0 m) · Approved 2022-03-23 · file A1314/21TEY · parking
- 64 Lippincott St (20 m) · Refused 2023-08-30 · file A0532/22TEY · garden or laneway suite
- 423 College St (40 m) · Approved 2026-09-02 · file A0242/26TEY
- 29 Lippincott St (70 m) · Refused 2025-03-19 · file A1067/24TEY
- 465 Bathurst St (80 m) · Approved 2025-10-01 · file A0608/25TEY
- Past decisions don't predict future ones; not a planning opinion.
Variance odds by categoryCity's Application Information Centre
Source: City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Flood, Moraine and Greenbelt
Favourable: Outside mapped flood and hazard areas
- Not within a conservation authority's mapped regulated area (flooding, erosion, wetlands). Mapping is approximate.
- Outside the Oak Ridges Moraine Conservation Plan area.
- Outside the Greenbelt Plan area.
Source: Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-04-29); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-10-31); Credit Valley Conservation, Generic Regulations Limit (2025) (2026-10-27); Central Lake Ontario Conservation Authority, CLOCA Regulated Areas (natural hazards regulation mapping, Nov 2025) (2026-10-31); Hamilton Conservation Authority, HCA Regulated Areas (O. Reg. 41/24) (2026-08-04); Province of Ontario, Oak Ridges Moraine: land use designations (Oak Ridges Moraine Conservation Plan, 2017) (2026-10-31); Province of Ontario, Greenbelt designations (Greenbelt Plan, 2017) (2026-10-31); Province of Ontario, Wetlands (Land Information Ontario): Provincially Significant Wetlands and other evaluated wetlands (2026-10-31); Province of Ontario, Areas of Natural and Scientific Interest (ANSI), life science and earth science (Land Information Ontario) (2026-10-31); Province of Ontario, Wooded Area (Land Information Ontario): mapped woodland cover, not a significance determination (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Water and sewer capacity
Information: Municipal water and sewer (no allocation published)
- City of Toronto: Toronto Water treats and distributes drinking water and collects and treats wastewater across the city. No servicing allocation system is published.
- Published figure: Not published
- Based on: City of Toronto, Toronto Water (2026-11-01)
- Public records; confirm with the municipality.
The report
Source: City of Toronto, City of Toronto, Toronto Water (2026-11-01); Province of Ontario (Land Information Ontario), Municipal Boundary – Lower and Single Tier (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Urban Area (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Towns and Villages (2026-11-01). Public records; not a legal, zoning or engineering opinion.
Transit and station areas
Information: Bathurst station 1.2 km away
- Nearest rapid transit or GO station: Bathurst (Line 2), 1.2 km in a straight line
Source: City of Toronto, Merged GTFS – TTC Routes and Schedules (subway and LRT routes, their shapes and the stations they serve) (2026-11-01); Province of Ontario, Ontario Railway Network (ORWN) track and station, filtered to GO Transit (Land Information Ontario; 2016 attribute vintage) (2026-10-31); York Region, Regional Official Plan 2022, Map 10 – Rapid Transit Network (proposed subway service and stations) (2026-10-31); City of Toronto, Minister-Approved Major Transit Station Areas (MTSA and Protected MTSA delineations) (2026-02-03); York Region, Regional Official Plan 2022, Appendix 2 – Major Transit Station Areas (boundaries and minimum density targets) (2026-10-31); Durham Region, Regional Official Plan (2024 consolidation), Map 3 – Protected Major Transit Station Areas (2026-10-31); City of Brampton, Brampton Plan, Schedule 1B – Primary Major Transit Station Areas (2026-06-11). Public records; not a legal, zoning or engineering opinion.
Commute
Favourable: Union Station: under 20 min by car, under 40 min by transit
- To Union Station: under 20 min by car · under 40 min by transit
- To Highway 404 / 407: under 60 min by car · over 60 min by transit
- Typical weekday morning, estimated from open road and transit schedule data (not live traffic or a trip planner).
Source: LSG commute estimate, Roads © OpenStreetMap contributors (ODbL); LSG commute estimate, TTC schedules: City of Toronto, Open Government Licence – Toronto; LSG commute estimate, Data used in this product or service is provided with the permission of Metrolinx. Public records; not a legal, zoning or engineering opinion.
Everyday needs
Favourable: Everyday Needs score 100/100 (walk 100, drive 100)
- Everyday Needs score 100/100: walking 100, driving 100 (everything close by)
- Grocery store: 2 min walk (FreshCo) · 1 min by car
- Pharmacy: 2 min walk (Shoppers Drug Mart) · 1 min by car
- Transit stop: 1 min walk (Bathurst St at College St (TTC))
- Shopping centre: 2 min walk (Winners) · 1 min by car
- Emergency department: 1 min walk (Toronto Western Hospital) · 1 min by car
- Hospital: 3 min walk (University Health Network - Toronto Western) · 1 min by car
- LSG estimate from open data: walking on mapped streets and paths at 4.8 km/h; driving at typical weekday rush-hour road speeds (not live traffic). Times are for the 200 m square around each address. Places can open, close or move; check before you rely on one.
- Places and paths © OpenStreetMap contributors, ODbL.
Source: LSG Realty, Everyday Needs score (LSG's own travel-time estimate) (2026-11-02); © OpenStreetMap contributors, ODbL, OpenStreetMap (Geofabrik Ontario extract): roads, footpaths, supermarkets and grocery stores, pharmacies, shopping centres and department stores, hospitals and emergency departments — Open Database Licence (ODbL) 1.0 (2026-11-02); Ontario Ministry of Health, Ministry of Health Service Provider Locations (MOHSERLO): hospital sites — Open Government Licence – Ontario (2026-11-02); City of Toronto (TTC), Merged GTFS – TTC Routes and Schedules (stops) — Open Government Licence – Toronto (2026-11-02); Metrolinx (GO Transit), GO Transit GTFS (stops) — Metrolinx Open Data Licence (2026-11-02); Metrolinx (UP Express), UP Express GTFS (stops) — Metrolinx Open Data Licence (2026-11-02). Public records; not a legal, zoning or engineering opinion.
Schools nearby
Information: Nearest elementary school: Kensington Community School School Junior, 70 m
- Kensington Community School School Junior (Elementary, 70 m) · Toronto DSB
- King Edward Junior and Senior Public School (Elementary, 240 m) · Toronto DSB
- da Vinci School (Elementary, 490 m) · Toronto DSB
- Bloor Collegiate Institute (Secondary, 760 m) · Toronto DSB
- Central Technical School (Secondary, 760 m) · Toronto DSB
- Harbord Collegiate Institute (Secondary, 840 m) · Toronto DSB
- The nearest school is not always the one that serves an address: use the board's locator. Boundaries change; confirm with the board.
TDSB school locator (Toronto District School Board)TCDSB school locator (Toronto Catholic District School Board)
Source: Ontario Ministry of Education, Ontario public school contact information (placed by Statistics Canada ODA addresses). Public records; not a legal, zoning or engineering opinion.
Parks
Favourable: Nearest park: The Doctors' Parkette, 240 m
- 11 parks and green spaces within 800 m
Source: City of Toronto, Green Spaces (2026-10-27); City of Brampton, Parks (2026-10-19); City of Brampton, Recreational Trails (2026-10-19); City of Ottawa, Parks and Greenspace (2026-10-31); OpenStreetMap, Parks, nature reserves and conservation areas (2026-10-29); OpenStreetMap, Named paths, trails and cycleways (2026-10-29). Public records; not a legal, zoning or engineering opinion.
Child care
Information: 14 licensed child care centres within 1 km
- Nearest: Kensington Kids Early Learning Centre (70 m) · 401 College Street, Toronto, ON M5T 1S9
- Licence status as of the ministry's latest monthly file. Ask the centre about spaces and fees.
Source: Ontario Ministry of Education, Licensed child care facilities in Ontario (2026-09-01). Public records; not a legal, zoning or engineering opinion.
Active development applications
Information: 11 active applications within 500 m
- Minor variance (Committee of Adjustment) · 6 Croft St (130 m) · Postponed · A0620/26TEY
- Site plan approval · 452 Bathurst St (130 m) · Under Review · 21 226199 STE 11 SA
- Site plan approval · 353 College St (and 2 more addresses) (270 m) · NOAC Issued · 18 111118 STE 20 SA
- Minor variance (Committee of Adjustment) · 267 Palmerston Ave (270 m) · Postponed · A0689/26TEY
- Minor variance (Committee of Adjustment) · 338 Markham St (280 m) · Postponed · A0026/26TEY
- From the municipality's open data. Check the municipality's file for the latest status.
Site plan approval · 452 Bathurst StSite plan approval · 353 College St (and 2 more addresses)
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Upcoming residential projects
Information: 8 upcoming residential projects within 1 km
- 452 Bathurst St (130 m) · Proposed: 6-storey, 49-unit mixed-use building
- 35 Bellevue Ave (350 m) · Under construction: 4-storey residential development (units not published)
- 502 Spadina Ave (and 1 more address) (540 m) · Proposed: 9-storey, 109-unit rental building
- 17 St Andrew St (610 m) · Under construction: 5-storey, 72-unit rental building
- 571 Dundas St W (and 2 more addresses) (680 m) · Approved: residential subdivision (units not published)
- From municipal open data. Not a listing or an offer to sell; details change. Confirm with the municipality.
452 Bathurst St502 Spadina Ave (and 1 more address)571 Dundas St W (and 2 more addresses)
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Building permits nearby
Information: 37 building permits within 250 m since 2024
- New building · 512 Bathurst St (180 m) · 2026-09-24 · Permit Issued
- Addition / alteration · 42 Lippincott St (80 m) · 2026-09-11 · Closed
- Addition / alteration · 463 College St (160 m) · 2026-08-27 · Permit Issued
- Addition / alteration · 301 Markham St (170 m) · 2026-08-27 · Permit Issued
- Addition / alteration · 30 Borden St (190 m) · 2026-07-20 · Closed
- From the municipality's open data. Check with the municipality for the permit's current status.
Source: City of Toronto, Building Permits – Active Permits (2026-10-30); City of Toronto, Building Permits – Cleared Permits (2026-10-30); City of Mississauga, Building Permits (issued since 2018) (2026-10-01); City of Brampton, Building Permits (GeoHub) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Heritage
Favourable: No heritage status found
- Not found on the City's Heritage Register or in a Heritage Conservation District.
- Heritage status limits changes; confirm with the municipality.
Source: City of Toronto, Heritage Register (listed properties, and properties designated under Part IV or Part V of the Ontario Heritage Act) (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-06-23). Public records; not a legal, zoning or engineering opinion.
Official Plan
Not available: Official Plan designation not available here
Public records; not a legal, zoning or engineering opinion.
Contaminated sites
Favourable: No federal contaminated sites within 500 m
- From government records. Absence from this map doesn't mean a site is clean; get a Phase I ESA.
Source: Treasury Board of Canada Secretariat, Federal Contaminated Sites Inventory (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Neighbourhood profile
Information: Median household income $77k
- Median household income (2020): $77,000
- Owner households: 45%
- Households with children: 10%
- Median age: 34.8
- Population density: 8,333 per km²
- Statistics Canada, Census of Population 2021 (income is for 2020), for the dissemination area around this address.
Source: Statistics Canada, Census of Population 2021, Census Profile and dissemination area boundaries (2022-04-27). Public records; not a legal, zoning or engineering opinion.