Lot
Information: Lot of about 517 m²
- Lot area: 517 m² · 0.13 acres · 5,560 sq ft (as stated in the parcel record)
- About 13.3 m wide and 38.9 m deep (estimated from the lot lines)
- Lot lines are approximate and not a survey.
Source: City of Toronto, Property Boundaries (2026-10-30). Public records; not a legal, zoning or engineering opinion.
Zoning
Information: Zoned R · Residential
- Category: Residential
- Zone label: R (d0.6) (x735)
- Zoning shown for reference only. The by-law text governs; confirm with the municipality.
Zoning by-law
Source: City of Toronto, Zoning By-law 569-2013 (open data) (2026-02-20). Public records; not a legal, zoning or engineering opinion.
Second units and garden suites
Favourable: Garden suite: likely allowed
- Likely allows additional units
- Second unit: likely allowed · Third unit: likely allowed
- Garden suite: likely allowed · Laneway suite: likely allowed
- Up to 2 additional units per lot in this municipality
- Screening from open data and the municipal by-law; not a zoning opinion. Confirm with the municipality.
Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-31); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, Toronto Centreline (public lanes) (2026-10-30); City of Toronto, Ravine & Natural Feature Protection area (2026-11-01); York Region, Parcel (property boundaries across York Region) (2026-11-01); York Region, Regional Official Plan 2022, Map 1 (Urban Area, Towns and Villages) (2026-11-01); Town of Newmarket, Zoning By-laws 2010-40 and 2019-06 (2026-10-10); Statistics Canada, 2021 Census census subdivisions (cartographic boundary file) (2026-11-01); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-11-01); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-11-01); Province of Ontario, Oak Ridges Moraine land use designations (2017 Plan) (2026-11-01); Province of Ontario, Greenbelt designations (2017 Plan) (2026-11-01). Public records; not a legal, zoning or engineering opinion.
Multiplex potential
Favourable: Multiplex: up to 6 units, potentially suitable
- Potentially suitable
- Up to 6 units under the City's multiplex rules (Sixplex Overlay)
- Preliminary screening from open data. Not a zoning opinion or development approval. Confirm with the City and a qualified professional.
Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-30); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, City Wards (25-ward model) (2026-02-20); City of Toronto, Heritage Register (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-09-01); City of Toronto, Ravine & Natural Feature Protection area (last refreshed by the City Jul 23, 2019) (2019-07-23); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Severance potential
Not available: Severance: not screened
- Can't screen this lot
- Estimated frontage 13.3 m
- Lot area 517 m²
- The zone label sets no minimum lot frontage or area to compare with
- Frontage is estimated from the lot lines, not surveyed.
- Approved severance: 436 Markham St (240 m) · 2022-03-23 · file B0014/21TEY
- Approved severance: 377 Manning Ave (250 m) · 2025-09-17 · file B0049/24TEY
- Approved severance: 91 Clinton St (290 m) · 2024-03-27 · file B0067/23TEY
- Needs Committee of Adjustment approval; not a planning opinion.
How severances work in Toronto
Source: City of Toronto, Property Boundaries (2026-10-30); City of Toronto, Zoning By-law 569-2013 (open data) (2026-02-20); City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Variance odds (Committee of Adjustment)
Favourable: 90% of 334 minor variances within 1 km approved (5 years)
- Within 1 km, last 3 years: 175 decisions: 88% approved (88% approved, 0% with conditions, 7% refused, 5% withdrawn)
- Within 1 km, last 5 years: 334 decisions: 90% approved (90% approved, 0% with conditions, 7% refused, 4% withdrawn)
- Ward 11, last 3 years: 480 decisions: 87% approved (87% approved, 0% with conditions, 8% refused, 5% withdrawn)
- Ward 11, last 5 years: 892 decisions: 89% approved (89% approved, <1% with conditions, 7% refused, 4% withdrawn)
- Typical time from application to decision: 13 weeks (median of 321)
- Named in the application (1 km, 5 years): garden or laneway suite 65 (91% approved); parking 28 (82% approved); floor space index / gross floor area 2; front yard setback 1; 248 name no category
- Conditions: 0 of 299 approvals within 1 km are recorded as conditional. The City's open data does not publish the conditions; read the decision.
- 366 Palmerston Blvd (0 m) · Approved 2026-01-21 · file A0845/25TEY · parking
- 364 Palmerston Blvd (10 m) · Approved 2025-11-12 · file A0716/25TEY
- 491 Euclid Ave (60 m) · Approved 2025-08-27 · file A0482/25TEY
- 390 Palmerston Blvd (70 m) · Approved 2025-03-26 · file A0096/25TEY · garden or laneway suite
- 390 Palmerston Blvd (70 m) · Withdrawn 2025-02-10 · file A0095/25TEY
- Past decisions don't predict future ones; not a planning opinion.
Variance odds by categoryCity's Application Information Centre
Source: City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Flood, Moraine and Greenbelt
Favourable: Outside mapped flood and hazard areas
- Not within a conservation authority's mapped regulated area (flooding, erosion, wetlands). Mapping is approximate.
- Outside the Oak Ridges Moraine Conservation Plan area.
- Outside the Greenbelt Plan area.
Source: Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-04-29); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-10-31); Credit Valley Conservation, Generic Regulations Limit (2025) (2026-10-27); Central Lake Ontario Conservation Authority, CLOCA Regulated Areas (natural hazards regulation mapping, Nov 2025) (2026-10-31); Hamilton Conservation Authority, HCA Regulated Areas (O. Reg. 41/24) (2026-08-04); Province of Ontario, Oak Ridges Moraine: land use designations (Oak Ridges Moraine Conservation Plan, 2017) (2026-10-31); Province of Ontario, Greenbelt designations (Greenbelt Plan, 2017) (2026-10-31); Province of Ontario, Wetlands (Land Information Ontario): Provincially Significant Wetlands and other evaluated wetlands (2026-10-31); Province of Ontario, Areas of Natural and Scientific Interest (ANSI), life science and earth science (Land Information Ontario) (2026-10-31); Province of Ontario, Wooded Area (Land Information Ontario): mapped woodland cover, not a significance determination (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Water and sewer capacity
Information: Municipal water and sewer (no allocation published)
- City of Toronto: Toronto Water treats and distributes drinking water and collects and treats wastewater across the city. No servicing allocation system is published.
- Published figure: Not published
- Based on: City of Toronto, Toronto Water (2026-11-01)
- Public records; confirm with the municipality.
The report
Source: City of Toronto, City of Toronto, Toronto Water (2026-11-01); Province of Ontario (Land Information Ontario), Municipal Boundary – Lower and Single Tier (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Urban Area (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Towns and Villages (2026-11-01). Public records; not a legal, zoning or engineering opinion.
Transit and station areas
Information: Christie station 860 m away
- Nearest rapid transit or GO station: Christie (Line 2), 860 m in a straight line
- 2 stations within 1 km
Source: City of Toronto, Merged GTFS – TTC Routes and Schedules (subway and LRT routes, their shapes and the stations they serve) (2026-11-01); Province of Ontario, Ontario Railway Network (ORWN) track and station, filtered to GO Transit (Land Information Ontario; 2016 attribute vintage) (2026-10-31); York Region, Regional Official Plan 2022, Map 10 – Rapid Transit Network (proposed subway service and stations) (2026-10-31); City of Toronto, Minister-Approved Major Transit Station Areas (MTSA and Protected MTSA delineations) (2026-02-03); York Region, Regional Official Plan 2022, Appendix 2 – Major Transit Station Areas (boundaries and minimum density targets) (2026-10-31); Durham Region, Regional Official Plan (2024 consolidation), Map 3 – Protected Major Transit Station Areas (2026-10-31); City of Brampton, Brampton Plan, Schedule 1B – Primary Major Transit Station Areas (2026-06-11). Public records; not a legal, zoning or engineering opinion.
Commute
Favourable: Union Station: under 20 min by car, under 40 min by transit
- To Union Station: under 20 min by car · under 40 min by transit
- To Highway 404 / 407: under 60 min by car · over 60 min by transit
- Typical weekday morning, estimated from open road and transit schedule data (not live traffic or a trip planner).
Source: LSG commute estimate, Roads © OpenStreetMap contributors (ODbL); LSG commute estimate, TTC schedules: City of Toronto, Open Government Licence – Toronto; LSG commute estimate, Data used in this product or service is provided with the permission of Metrolinx. Public records; not a legal, zoning or engineering opinion.
Everyday needs
Favourable: Everyday Needs score 99/100 (walk 98, drive 100)
- Everyday Needs score 99/100: walking 98, driving 100 (everything close by)
- Grocery store: 7 min walk (FreshCo) · 2 min by car
- Pharmacy: 2 min walk (College Medical Pharmacy) · 1 min by car (College Pharmacy II)
- Transit stop: 3 min walk (College St at Euclid Ave (TTC))
- Shopping centre: 7 min walk (Winners) · 2 min by car
- Emergency department: 8 min walk (Toronto Western Hospital) · 2 min by car
- Hospital: 9 min walk (University Health Network - Toronto Western) · 2 min by car
- LSG estimate from open data: walking on mapped streets and paths at 4.8 km/h; driving at typical weekday rush-hour road speeds (not live traffic). Times are for the 200 m square around each address. Places can open, close or move; check before you rely on one.
- Places and paths © OpenStreetMap contributors, ODbL.
Source: LSG Realty, Everyday Needs score (LSG's own travel-time estimate) (2026-11-02); © OpenStreetMap contributors, ODbL, OpenStreetMap (Geofabrik Ontario extract): roads, footpaths, supermarkets and grocery stores, pharmacies, shopping centres and department stores, hospitals and emergency departments — Open Database Licence (ODbL) 1.0 (2026-11-02); Ontario Ministry of Health, Ministry of Health Service Provider Locations (MOHSERLO): hospital sites — Open Government Licence – Ontario (2026-11-02); City of Toronto (TTC), Merged GTFS – TTC Routes and Schedules (stops) — Open Government Licence – Toronto (2026-11-02); Metrolinx (GO Transit), GO Transit GTFS (stops) — Metrolinx Open Data Licence (2026-11-02); Metrolinx (UP Express), UP Express GTFS (stops) — Metrolinx Open Data Licence (2026-11-02). Public records; not a legal, zoning or engineering opinion.
Schools nearby
Information: Nearest elementary school: Clinton Street Junior Public School, 230 m
- Clinton Street Junior Public School (Elementary, 230 m) · Toronto DSB
- King Edward Junior and Senior Public School (Elementary, 320 m) · Toronto DSB
- St Francis of Assisi Catholic School (Elementary, 350 m) · Toronto CDSB
- Harbord Collegiate Institute (Secondary, 410 m) · Toronto DSB
- Bloor Collegiate Institute (Secondary, 560 m) · Toronto DSB
- Central Technical School (Secondary, 560 m) · Toronto DSB
- The nearest school is not always the one that serves an address: use the board's locator. Boundaries change; confirm with the board.
TDSB school locator (Toronto District School Board)TCDSB school locator (Toronto Catholic District School Board)
Source: Ontario Ministry of Education, Ontario public school contact information (placed by Statistics Canada ODA addresses). Public records; not a legal, zoning or engineering opinion.
Parks
Favourable: Nearest park: Healey Willan Park, 150 m
- 10 parks and green spaces within 800 m
Source: City of Toronto, Green Spaces (2026-10-27); City of Brampton, Parks (2026-10-19); City of Brampton, Recreational Trails (2026-10-19); City of Ottawa, Parks and Greenspace (2026-10-31); OpenStreetMap, Parks, nature reserves and conservation areas (2026-10-29); OpenStreetMap, Named paths, trails and cycleways (2026-10-29). Public records; not a legal, zoning or engineering opinion.
Child care
Information: 11 licensed child care centres within 1 km
- Nearest: Centro-Clinton Day Care Centre (230 m) · 460 Manning Avenue, Toronto, ON M6G 2V7
- Licence status as of the ministry's latest monthly file. Ask the centre about spaces and fees.
Source: Ontario Ministry of Education, Licensed child care facilities in Ontario (2026-09-01). Public records; not a legal, zoning or engineering opinion.
Active development applications
Information: 8 active applications within 500 m
- Minor variance (Committee of Adjustment) · 519 Euclid Ave (110 m) · Postponed · A0362/26TEY
- Minor variance (Committee of Adjustment) · 338 Markham St (170 m) · Postponed · A0026/26TEY
- Minor variance (Committee of Adjustment) · 541 Euclid Ave (190 m) · Postponed · A0680/26TEY
- Minor variance (Committee of Adjustment) · 267 Palmerston Ave (400 m) · Postponed · A0689/26TEY
- Minor variance (Committee of Adjustment) · 235 Grace St (420 m) · Approved · A0635/26TEY
- From the municipality's open data. Check the municipality's file for the latest status.
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Upcoming residential projects
Information: 6 upcoming residential projects within 1 km
- 452 Bathurst St (430 m) · Proposed: 6-storey, 49-unit mixed-use building
- 501 Palmerston Blvd (510 m) · Under construction: 3-storey, 12-unit apartment building
- 736 Bathurst St (590 m) · Proposed: 40-storey, 386-unit mixed-use building
- 35 Bellevue Ave (800 m) · Under construction: 4-storey residential development (units not published)
- 502 Spadina Ave (and 1 more address) (850 m) · Proposed: 9-storey, 109-unit rental building
- From municipal open data. Not a listing or an offer to sell; details change. Confirm with the municipality.
452 Bathurst St736 Bathurst St502 Spadina Ave (and 1 more address)
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Building permits nearby
Information: 45 building permits within 250 m since 2024
- Addition / alteration · 566 Bathurst St (200 m) · 2026-10-28 · Revision Issued
- New building · 377 Manning Ave (250 m) · 2026-10-22 · Revision Issued
- New building · 377 Manning Ave (250 m) · 2026-09-30 · Permit Issued
- New building · 409 Manning Ave (180 m) · 2026-09-14 · Permit Issued
- Demolition · 377 Manning Ave (250 m) · 2026-08-26 · Closed
- From the municipality's open data. Check with the municipality for the permit's current status.
Source: City of Toronto, Building Permits – Active Permits (2026-10-30); City of Toronto, Building Permits – Cleared Permits (2026-10-30); City of Mississauga, Building Permits (issued since 2018) (2026-10-01); City of Brampton, Building Permits (GeoHub) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Heritage
Favourable: No heritage status found
- Not found on the City's Heritage Register or in a Heritage Conservation District.
- Heritage status limits changes; confirm with the municipality.
Source: City of Toronto, Heritage Register (listed properties, and properties designated under Part IV or Part V of the Ontario Heritage Act) (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-06-23). Public records; not a legal, zoning or engineering opinion.
Official Plan
Not available: Official Plan designation not available here
Public records; not a legal, zoning or engineering opinion.
Contaminated sites
Favourable: No federal contaminated sites within 500 m
- From government records. Absence from this map doesn't mean a site is clean; get a Phase I ESA.
Source: Treasury Board of Canada Secretariat, Federal Contaminated Sites Inventory (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Neighbourhood profile
Information: Median household income $99k
- Median household income (2020): $99,000
- Owner households: 49%
- Households with children: 20%
- Median age: 37.2
- Population density: 9,282 per km²
- Statistics Canada, Census of Population 2021 (income is for 2020), for the dissemination area around this address.
Source: Statistics Canada, Census of Population 2021, Census Profile and dissemination area boundaries (2022-04-27). Public records; not a legal, zoning or engineering opinion.