Lot
Information: Lot of about 1,715 m²
- Lot area: 1,715 m² · 0.42 acres · 18,460 sq ft (as stated in the parcel record)
- About 23.7 m wide and 79.9 m deep (estimated from the lot lines)
- Lot lines are approximate and not a survey.
Source: City of Toronto, Property Boundaries (2026-10-30). Public records; not a legal, zoning or engineering opinion.
Zoning
Not available: Zoning not in open data for Toronto
- Ask the municipality's zoning desk, or read the zoning by-law map. The map has zoning for Toronto and Newmarket today.
Public records; not a legal, zoning or engineering opinion.
Second units and garden suites
Information: Additional units: needs a check
- Check zoning / further investigation
- Second unit: possible; needs a check · Third unit: possible; needs a check
- Garden suite: possible; needs a check · Laneway suite: possible; needs a check
- Up to 2 additional units per lot in this municipality
- Not under Zoning By-law 569-2013 (a former municipal by-law applies): check with the City
- Screening from open data and the municipal by-law; not a zoning opinion. Confirm with the municipality.
Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-31); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, Toronto Centreline (public lanes) (2026-10-30); City of Toronto, Ravine & Natural Feature Protection area (2026-11-01); York Region, Parcel (property boundaries across York Region) (2026-11-01); York Region, Regional Official Plan 2022, Map 1 (Urban Area, Towns and Villages) (2026-11-01); Town of Newmarket, Zoning By-laws 2010-40 and 2019-06 (2026-10-10); Statistics Canada, 2021 Census census subdivisions (cartographic boundary file) (2026-11-01); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-11-01); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-11-01); Province of Ontario, Oak Ridges Moraine land use designations (2017 Plan) (2026-11-01); Province of Ontario, Greenbelt designations (2017 Plan) (2026-11-01). Public records; not a legal, zoning or engineering opinion.
Multiplex potential
Information: Multiplex: further investigation required
- Further investigation required
- Not under Zoning By-law 569-2013 (a former municipal by-law applies): check with the City
- Heritage: designated property (Part IV, Ontario Heritage Act)
- Preliminary screening from open data. Not a zoning opinion or development approval. Confirm with the City and a qualified professional.
Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-30); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, City Wards (25-ward model) (2026-02-20); City of Toronto, Heritage Register (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-09-01); City of Toronto, Ravine & Natural Feature Protection area (last refreshed by the City Jul 23, 2019) (2019-07-23); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Severance potential
Not available: Severance screening not available for this lot
Public records; not a legal, zoning or engineering opinion.
Variance odds (Committee of Adjustment)
Favourable: 95% of 78 minor variances within 1 km approved (5 years)
- Within 1 km, last 3 years: 55 decisions: 93% approved (93% approved, 0% with conditions, 4% refused, 4% withdrawn)
- Within 1 km, last 5 years: 78 decisions: 95% approved (95% approved, 0% with conditions, 3% refused, 3% withdrawn)
- Ward 10, last 3 years: 169 decisions: 93% approved (93% approved, 0% with conditions, 3% refused, 4% withdrawn)
- Ward 10, last 5 years: 279 decisions: 92% approved (92% approved, 0% with conditions, 4% refused, 4% withdrawn)
- Typical time from application to decision: 12 weeks (median of 75)
- Named in the application (1 km, 5 years): parking 25 (92% approved); floor space index / gross floor area 14 (86% approved); building height 13 (85% approved); lot frontage / lot area 3; 41 name no category
- Conditions: 0 of 74 approvals within 1 km are recorded as conditional. The City's open data does not publish the conditions; read the decision.
- 321 King St W (80 m) · Approved 2024-08-28 · file A0482/24TEY · parking
- 99 Blue Jays Way (110 m) · Approved 2023-01-25 · file A1076/22TEY · parking
- 277 Wellington St W (140 m) · Approved 2026-04-15 · file A0086/26TEY · floor space index / gross floor area, building height
- 357 King St W (180 m) · Approved 2024-01-31 · file A1036/23TEY · floor space index / gross floor area
- 365 King St W (180 m) · Approved 2023-03-08 · file A1298/22TEY
- Past decisions don't predict future ones; not a planning opinion.
Variance odds by categoryCity's Application Information Centre
Source: City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Flood, Moraine and Greenbelt
Favourable: Outside mapped flood and hazard areas
- Not within a conservation authority's mapped regulated area (flooding, erosion, wetlands). Mapping is approximate.
- Outside the Oak Ridges Moraine Conservation Plan area.
- Outside the Greenbelt Plan area.
Source: Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-04-29); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-10-31); Credit Valley Conservation, Generic Regulations Limit (2025) (2026-10-27); Central Lake Ontario Conservation Authority, CLOCA Regulated Areas (natural hazards regulation mapping, Nov 2025) (2026-10-31); Hamilton Conservation Authority, HCA Regulated Areas (O. Reg. 41/24) (2026-08-04); Province of Ontario, Oak Ridges Moraine: land use designations (Oak Ridges Moraine Conservation Plan, 2017) (2026-10-31); Province of Ontario, Greenbelt designations (Greenbelt Plan, 2017) (2026-10-31); Province of Ontario, Wetlands (Land Information Ontario): Provincially Significant Wetlands and other evaluated wetlands (2026-10-31); Province of Ontario, Areas of Natural and Scientific Interest (ANSI), life science and earth science (Land Information Ontario) (2026-10-31); Province of Ontario, Wooded Area (Land Information Ontario): mapped woodland cover, not a significance determination (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Water and sewer capacity
Information: Municipal water and sewer (no allocation published)
- City of Toronto: Toronto Water treats and distributes drinking water and collects and treats wastewater across the city. No servicing allocation system is published.
- Published figure: Not published
- Based on: City of Toronto, Toronto Water (2026-11-01)
- Public records; confirm with the municipality.
The report
Source: City of Toronto, City of Toronto, Toronto Water (2026-11-01); Province of Ontario (Land Information Ontario), Municipal Boundary – Lower and Single Tier (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Urban Area (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Towns and Villages (2026-11-01). Public records; not a legal, zoning or engineering opinion.
Transit and station areas
Favourable: In a station area · St Andrew 490 m
- Nearest rapid transit or GO station: St Andrew (Line 1), 490 m in a straight line
- 4 stations within 1 km
- Inside the Osgoode Protected Major Transit Station Area. Station area boundaries and density targets come from the Official Plan. Confirm with the municipality.
Source: City of Toronto, Merged GTFS – TTC Routes and Schedules (subway and LRT routes, their shapes and the stations they serve) (2026-11-01); Province of Ontario, Ontario Railway Network (ORWN) track and station, filtered to GO Transit (Land Information Ontario; 2016 attribute vintage) (2026-10-31); York Region, Regional Official Plan 2022, Map 10 – Rapid Transit Network (proposed subway service and stations) (2026-10-31); City of Toronto, Minister-Approved Major Transit Station Areas (MTSA and Protected MTSA delineations) (2026-02-03); York Region, Regional Official Plan 2022, Appendix 2 – Major Transit Station Areas (boundaries and minimum density targets) (2026-10-31); Durham Region, Regional Official Plan (2024 consolidation), Map 3 – Protected Major Transit Station Areas (2026-10-31); City of Brampton, Brampton Plan, Schedule 1B – Primary Major Transit Station Areas (2026-06-11). Public records; not a legal, zoning or engineering opinion.
Commute
Favourable: Union Station: under 20 min by car, under 20 min by transit
- To Union Station: under 20 min by car · under 20 min by transit
- To Highway 404 / 407: under 40 min by car · over 60 min by transit
- Typical weekday morning, estimated from open road and transit schedule data (not live traffic or a trip planner).
Source: LSG commute estimate, Roads © OpenStreetMap contributors (ODbL); LSG commute estimate, TTC schedules: City of Toronto, Open Government Licence – Toronto; LSG commute estimate, Data used in this product or service is provided with the permission of Metrolinx. Public records; not a legal, zoning or engineering opinion.
Schools nearby
Information: Nearest elementary school: Ogden Junior Public School, 630 m
- Ogden Junior Public School (Elementary, 630 m) · Toronto DSB
- ALPHA Alternative Junior School (Elementary, 630 m) · Toronto DSB
- Oasis Alternative Secondary School (Secondary, 630 m) · Toronto DSB
- Bishop Macdonell Catholic School (Elementary, 760 m) · Toronto CDSB
- Contact Alternative School School (Secondary, 910 m) · Toronto DSB
- Heydon Park Secondary School (Secondary, 1.1 km) · Toronto DSB
- The nearest school is not always the one that serves an address: use the board's locator. Boundaries change; confirm with the board.
TDSB school locator (Toronto District School Board)TCDSB school locator (Toronto Catholic District School Board)
Source: Ontario Ministry of Education, Ontario public school contact information (placed by Statistics Canada ODA addresses). Public records; not a legal, zoning or engineering opinion.
Parks
Favourable: Nearest park: David Pecaut Square, 90 m
- 18 parks and green spaces within 800 m
Source: City of Toronto, Green Spaces (2026-10-27); City of Brampton, Parks (2026-10-19); City of Brampton, Recreational Trails (2026-10-19); City of Ottawa, Parks and Greenspace (2026-10-31); OpenStreetMap, Parks, nature reserves and conservation areas (2026-10-29); OpenStreetMap, Named paths, trails and cycleways (2026-10-29). Public records; not a legal, zoning or engineering opinion.
Child care
Information: 20 licensed child care centres within 1 km
- Nearest: Kids & Company - Front Street Site (180 m) · 320 Front Street, Toronto, ON M5V 3B6
- Licence status as of the ministry's latest monthly file. Ask the centre about spaces and fees.
Source: Ontario Ministry of Education, Licensed child care facilities in Ontario (2026-09-01). Public records; not a legal, zoning or engineering opinion.
Active development applications
Information: 62 active applications within 500 m
- Site plan approval · 24 Mercer St (40 m) · NOAC Issued · 15 212573 STE 20 SA
- Draft plan of condominium · 35 Mercer St (and 1 more address) (60 m) · Under Review · 23 192792 STE 10 CD
- Official plan and/or zoning by-law amendment · 305 King St W (and 6 more addresses) (70 m) · OMB Approved · 13 144733 STE 20 OZ
- Minor variance (Committee of Adjustment) · 315 King St W (80 m) · Prepare Notice · A1079/16TEY
- Site plan approval · 301 King St W (and 6 more addresses) (90 m) · Under Review · 22 204481 STE 10 SA
- From the municipality's open data. Check the municipality's file for the latest status.
Site plan approval · 24 Mercer StDraft plan of condominium · 35 Mercer St (and 1 more address)Official plan and/or zoning by-law amendment · 305 King St W (and 6 more addresses)
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Upcoming residential projects
Information: 55 upcoming residential projects within 1 km
- 35 Mercer St (and 1 more address) (60 m) · Proposed: 35-unit condominium
- 305 King St W (and 6 more addresses) (70 m) · Approved: 50-storey, 403-unit mixed-use building
- 301 King St W (and 6 more addresses) (90 m) · Proposed: 50-storey, 403-unit mixed-use building
- 277 Wellington St W (140 m) · Proposed: 645-unit condominium, up to 66 storeys
- 86 John St (170 m) · Proposed: 10-storey, 14-unit mixed-use building
- From municipal open data. Not a listing or an offer to sell; details change. Confirm with the municipality.
35 Mercer St (and 1 more address)305 King St W (and 6 more addresses)301 King St W (and 6 more addresses)
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Building permits nearby
Information: 76 building permits within 250 m since 2024
- Addition / alteration · 225 King St W (210 m) · 2026-10-21 · Permit Issued
- Addition / alteration · 200 Wellington St W (210 m) · 2026-10-19 · Permit Issued
- Addition / alteration · 200 Wellington St W (210 m) · 2026-10-14 · Permit Issued
- Addition / alteration · 225 Wellington St W (130 m) · 2026-09-03 · Permit Issued
- Addition / alteration · 200 Wellington St W (210 m) · 2026-08-28 · Permit Issued
- From the municipality's open data. Check with the municipality for the permit's current status.
Source: City of Toronto, Building Permits – Active Permits (2026-10-30); City of Toronto, Building Permits – Cleared Permits (2026-10-30); City of Mississauga, Building Permits (issued since 2018) (2026-10-01); City of Brampton, Building Permits (GeoHub) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Heritage
Favourable: No heritage status found
- Not found on the City's Heritage Register or in a Heritage Conservation District.
- Heritage status limits changes; confirm with the municipality.
Source: City of Toronto, Heritage Register (listed properties, and properties designated under Part IV or Part V of the Ontario Heritage Act) (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-06-23). Public records; not a legal, zoning or engineering opinion.
Official Plan
Not available: Official Plan designation not available here
Public records; not a legal, zoning or engineering opinion.
Contaminated sites
Check: 1 federal contaminated site within 500 m
- CN Tower (301 Front Street) (420 m) · Closed
- From government records. Absence from this map doesn't mean a site is clean; get a Phase I ESA.
Source: Treasury Board of Canada Secretariat, Federal Contaminated Sites Inventory (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Neighbourhood profile
Information: Median household income $80k
- Median household income (2020): $80,000
- Owner households: 30%
- Households with children: 8%
- Median age: 30.2
- Population density: 24,283 per km²
- Statistics Canada, Census of Population 2021 (income is for 2020), for the dissemination area around this address.
Source: Statistics Canada, Census of Population 2021, Census Profile and dissemination area boundaries (2022-04-27). Public records; not a legal, zoning or engineering opinion.