Lot
Information: Lot of about 149 m²
- Lot area: 149 m² · 0.037 acres · 1,607 sq ft (as stated in the parcel record)
- About 5.1 m wide and 30.3 m deep (estimated from the lot lines)
- Lot lines are approximate and not a survey.
Source: City of Toronto, Property Boundaries (2026-10-30). Public records; not a legal, zoning or engineering opinion.
Zoning
Information: Zoned CR · Commercial Residential
- Category: Mixed use
- Zone label: CR 3.0 (c1.0; r2.5) SS2 (x2179)
- Zoning shown for reference only. The by-law text governs; confirm with the municipality.
Zoning by-law
Source: City of Toronto, Zoning By-law 569-2013 (open data) (2026-02-20). Public records; not a legal, zoning or engineering opinion.
Second units and garden suites
Limits apply: Additional units: not likely
- Unlikely
- Second unit: not likely · Third unit: not likely
- Garden suite: not likely · Laneway suite: not likely
- Up to 2 additional units per lot in this municipality
- Not a residential zone: the permission is for detached, semi-detached and row houses
- Screening from open data and the municipal by-law; not a zoning opinion. Confirm with the municipality.
Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-31); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, Toronto Centreline (public lanes) (2026-10-30); City of Toronto, Ravine & Natural Feature Protection area (2026-11-01); York Region, Parcel (property boundaries across York Region) (2026-11-01); York Region, Regional Official Plan 2022, Map 1 (Urban Area, Towns and Villages) (2026-11-01); Town of Newmarket, Zoning By-laws 2010-40 and 2019-06 (2026-10-10); Statistics Canada, 2021 Census census subdivisions (cartographic boundary file) (2026-11-01); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-11-01); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-11-01); Province of Ontario, Oak Ridges Moraine land use designations (2017 Plan) (2026-11-01); Province of Ontario, Greenbelt designations (2017 Plan) (2026-11-01). Public records; not a legal, zoning or engineering opinion.
Multiplex potential
Limits apply: Multiplex: apparently unsuitable
- Apparently unsuitable
- Not a residential zone
- Heritage: listed on the Heritage Register (not designated)
- Heritage Conservation District
- Preliminary screening from open data. Not a zoning opinion or development approval. Confirm with the City and a qualified professional.
Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-30); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, City Wards (25-ward model) (2026-02-20); City of Toronto, Heritage Register (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-09-01); City of Toronto, Ravine & Natural Feature Protection area (last refreshed by the City Jul 23, 2019) (2019-07-23); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Severance potential
Limits apply: Severance: unlikely
- Severance unlikely
- Estimated frontage 5.1 m
- Lot area 149 m²
- Not a low-rise residential zone (R, RD, RS, RT or RM)
- Frontage is estimated from the lot lines, not surveyed.
- Approved severance: 39 Gladstone Ave (180 m) · 2023-01-18 · file B0030/22TEY
- Approved severance: 20 Gladstone Ave (200 m) · 2024-01-31 · file B0061/23TEY
- Approved severance: 32 Lisgar St (240 m) · 2018-10-24 · file B0053/18TEY
- Needs Committee of Adjustment approval; not a planning opinion.
How severances work in Toronto
Source: City of Toronto, Property Boundaries (2026-10-30); City of Toronto, Zoning By-law 569-2013 (open data) (2026-02-20); City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Variance odds (Committee of Adjustment)
Favourable: 91% of 219 minor variances within 1 km approved (5 years)
- Within 1 km, last 3 years: 119 decisions: 88% approved (88% approved, 0% with conditions, 7% refused, 5% withdrawn)
- Within 1 km, last 5 years: 219 decisions: 91% approved (91% approved, 0% with conditions, 5% refused, 4% withdrawn)
- Ward 9, last 3 years: 388 decisions: 93% approved (93% approved, 0% with conditions, 6% refused, 2% withdrawn)
- Ward 9, last 5 years: 779 decisions: 92% approved (92% approved, 0% with conditions, 6% refused, 2% withdrawn)
- Typical time from application to decision: 13 weeks (median of 210)
- Named in the application (1 km, 5 years): parking 40 (93% approved); garden or laneway suite 32 (88% approved); building height 12 (100% approved); floor space index / gross floor area 10 (100% approved); 146 name no category
- Conditions: 0 of 200 approvals within 1 km are recorded as conditional. The City's open data does not publish the conditions; read the decision.
- 1166 Queen St W (10 m) · Approved 2024-11-20 · file A0812/24TEY · parking
- 7 Northcote Ave (50 m) · Approved 2022-10-26 · file A0854/22TEY · garden or laneway suite
- 11 Northcote Ave (60 m) · Approved 2026-03-18 · file A0002/26TEY · garden or laneway suite
- 9 Beaconsfield Ave (70 m) · Approved 2025-09-10 · file A0543/25TEY · parking
- 20 Beaconsfield Ave (90 m) · Approved 2026-05-06 · file A0597/25TEY · rear yard setback, parking, garden or laneway suite
- Past decisions don't predict future ones; not a planning opinion.
Variance odds by categoryCity's Application Information Centre
Source: City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Flood, Moraine and Greenbelt
Favourable: Outside mapped flood and hazard areas
- Not within a conservation authority's mapped regulated area (flooding, erosion, wetlands). Mapping is approximate.
- Outside the Oak Ridges Moraine Conservation Plan area.
- Outside the Greenbelt Plan area.
Source: Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-04-29); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-10-31); Credit Valley Conservation, Generic Regulations Limit (2025) (2026-10-27); Central Lake Ontario Conservation Authority, CLOCA Regulated Areas (natural hazards regulation mapping, Nov 2025) (2026-10-31); Hamilton Conservation Authority, HCA Regulated Areas (O. Reg. 41/24) (2026-08-04); Province of Ontario, Oak Ridges Moraine: land use designations (Oak Ridges Moraine Conservation Plan, 2017) (2026-10-31); Province of Ontario, Greenbelt designations (Greenbelt Plan, 2017) (2026-10-31); Province of Ontario, Wetlands (Land Information Ontario): Provincially Significant Wetlands and other evaluated wetlands (2026-10-31); Province of Ontario, Areas of Natural and Scientific Interest (ANSI), life science and earth science (Land Information Ontario) (2026-10-31); Province of Ontario, Wooded Area (Land Information Ontario): mapped woodland cover, not a significance determination (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Water and sewer capacity
Information: Municipal water and sewer (no allocation published)
- City of Toronto: Toronto Water treats and distributes drinking water and collects and treats wastewater across the city. No servicing allocation system is published.
- Published figure: Not published
- Based on: City of Toronto, Toronto Water (2026-11-01)
- Public records; confirm with the municipality.
The report
Source: City of Toronto, City of Toronto, Toronto Water (2026-11-01); Province of Ontario (Land Information Ontario), Municipal Boundary – Lower and Single Tier (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Urban Area (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Towns and Villages (2026-11-01). Public records; not a legal, zoning or engineering opinion.
Transit and station areas
Favourable: In a station area · Exhibition GO 940 m
- Nearest rapid transit or GO station: Exhibition GO (Lakeshore West), 940 m in a straight line
- Inside the King-Liberty Protected Major Transit Station Area. Station area boundaries and density targets come from the Official Plan. Confirm with the municipality.
Source: City of Toronto, Merged GTFS – TTC Routes and Schedules (subway and LRT routes, their shapes and the stations they serve) (2026-11-01); Province of Ontario, Ontario Railway Network (ORWN) track and station, filtered to GO Transit (Land Information Ontario; 2016 attribute vintage) (2026-10-31); York Region, Regional Official Plan 2022, Map 10 – Rapid Transit Network (proposed subway service and stations) (2026-10-31); City of Toronto, Minister-Approved Major Transit Station Areas (MTSA and Protected MTSA delineations) (2026-02-03); York Region, Regional Official Plan 2022, Appendix 2 – Major Transit Station Areas (boundaries and minimum density targets) (2026-10-31); Durham Region, Regional Official Plan (2024 consolidation), Map 3 – Protected Major Transit Station Areas (2026-10-31); City of Brampton, Brampton Plan, Schedule 1B – Primary Major Transit Station Areas (2026-06-11). Public records; not a legal, zoning or engineering opinion.
Commute
Favourable: Union Station: under 20 min by car, under 40 min by transit
- To Union Station: under 20 min by car · under 40 min by transit
- To Highway 404 / 407: under 60 min by car · over 60 min by transit
- Typical weekday morning, estimated from open road and transit schedule data (not live traffic or a trip planner).
Source: LSG commute estimate, Roads © OpenStreetMap contributors (ODbL); LSG commute estimate, TTC schedules: City of Toronto, Open Government Licence – Toronto; LSG commute estimate, Data used in this product or service is provided with the permission of Metrolinx. Public records; not a legal, zoning or engineering opinion.
Schools nearby
Information: Nearest elementary school: Alexander Muir/Gladstone Ave Junior and Senior Public School, 430 m
- Alexander Muir/Gladstone Ave Junior and Senior Public School (Elementary, 430 m) · Toronto DSB
- The Grove Community School (Elementary, 430 m) · Toronto DSB
- Givins/Shaw Junior Public School (Elementary, 720 m) · Toronto DSB
- Parkdale Collegiate Institute (Secondary, 940 m) · Toronto DSB
- École secondaire Toronto Ouest (Secondary, 1.6 km) · CS Viamonde
- ÉSC Saint-Frère-André (Secondary, 1.6 km) · CS catholique MonAvenir
- The nearest school is not always the one that serves an address: use the board's locator. Boundaries change; confirm with the board.
TDSB school locator (Toronto District School Board)TCDSB school locator (Toronto Catholic District School Board)
Source: Ontario Ministry of Education, Ontario public school contact information (placed by Statistics Canada ODA addresses). Public records; not a legal, zoning or engineering opinion.
Parks
Favourable: Nearest park: Lisgar Park, 90 m
- 18 parks and green spaces within 800 m
Source: City of Toronto, Green Spaces (2026-10-27); City of Brampton, Parks (2026-10-19); City of Brampton, Recreational Trails (2026-10-19); City of Ottawa, Parks and Greenspace (2026-10-31); OpenStreetMap, Parks, nature reserves and conservation areas (2026-10-29); OpenStreetMap, Named paths, trails and cycleways (2026-10-29). Public records; not a legal, zoning or engineering opinion.
Child care
Information: 12 licensed child care centres within 1 km
- Nearest: Bonaventure Child Care Centre - (Ideal Child Services Group) (370 m) · 295 Dufferin Street, Toronto, ON M6K 1Z7
- Licence status as of the ministry's latest monthly file. Ask the centre about spaces and fees.
Source: Ontario Ministry of Education, Licensed child care facilities in Ontario (2026-09-01). Public records; not a legal, zoning or engineering opinion.
Active development applications
Information: 17 active applications within 500 m
- Official plan and/or zoning by-law amendment · 1153 Queen St W (60 m) · OMB Appeal · 24 238364 STE 09 OZ
- Minor variance (Committee of Adjustment) · 18 Beaconsfield Ave (80 m) · Hearing Scheduled · A0523/26TEY
- Draft plan of condominium · 23 Northcote Ave (80 m) · Under Review · 24 106262 STE 09 CD
- Minor variance (Committee of Adjustment) · 1136 Queen St W (100 m) · Postponed · A0601/24TEY
- Minor variance (Committee of Adjustment) · 1198 Queen St W (110 m) · Postponed · A0712/26TEY
- From the municipality's open data. Check the municipality's file for the latest status.
Official plan and/or zoning by-law amendment · 1153 Queen St WDraft plan of condominium · 23 Northcote Ave
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Upcoming residential projects
Information: 24 upcoming residential projects within 1 km
- 1153 Queen St W (60 m) · Proposed: 27-storey, 367-unit mixed-use building
- 23 Northcote Ave (80 m) · Proposed: 3-storey, 2-unit condominium
- 1117 Queen St W (120 m) · Proposed: 29-storey, 272-unit mixed-use building
- 31 Gladstone Ave (and 1 more address) (160 m) · Proposed: 6-storey, 28-unit apartment building
- 99 Sudbury St (310 m) · Proposed: 190-unit mixed-use building, up to 26 storeys
- From municipal open data. Not a listing or an offer to sell; details change. Confirm with the municipality.
1153 Queen St W23 Northcote Ave1117 Queen St W
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Building permits nearby
Information: 51 building permits within 250 m since 2024
- New building · 11 Northcote Ave (60 m) · 2026-10-28 · Permit Issued
- Addition / alteration · 157 Lisgar St (240 m) · 2026-10-21 · Revision Issued
- Addition / alteration · 20 Beaconsfield Ave (90 m) · 2026-08-31 · Closed
- Addition / alteration · 75 Northcote Ave (240 m) · 2026-08-27 · Permit Issued
- Addition / alteration · 31 Beaconsfield Ave (140 m) · 2026-08-25 · Revision Issued
- From the municipality's open data. Check with the municipality for the permit's current status.
Source: City of Toronto, Building Permits – Active Permits (2026-10-30); City of Toronto, Building Permits – Cleared Permits (2026-10-30); City of Mississauga, Building Permits (issued since 2018) (2026-10-01); City of Brampton, Building Permits (GeoHub) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Heritage
Check: In West Queen West HCD
- Heritage Conservation District: West Queen West (District under appeal)
- Heritage status limits changes; confirm with the municipality.
Source: City of Toronto, Heritage Register (listed properties, and properties designated under Part IV or Part V of the Ontario Heritage Act) (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-06-23). Public records; not a legal, zoning or engineering opinion.
Official Plan
Not available: Official Plan designation not available here
Public records; not a legal, zoning or engineering opinion.
Contaminated sites
Favourable: No federal contaminated sites within 500 m
- From government records. Absence from this map doesn't mean a site is clean; get a Phase I ESA.
Source: Treasury Board of Canada Secretariat, Federal Contaminated Sites Inventory (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Neighbourhood profile
Information: Median household income $97k
- Median household income (2020): $97,000
- Owner households: 37%
- Households with children: 17%
- Median age: 41.2
- Population density: 11,484 per km²
- Statistics Canada, Census of Population 2021 (income is for 2020), for the dissemination area around this address.
Source: Statistics Canada, Census of Population 2021, Census Profile and dissemination area boundaries (2022-04-27). Public records; not a legal, zoning or engineering opinion.