Property report · public records

114 Baldwin St

Toronto, Ontario

  • Garden suite: likely allowed
  • Outside mapped flood areas
  • Zoned R

Lot Potential Score 77 out of 100, Strong

StrongMedium confidence: 1 fact not known

  • +14Second and third units. A second and a third unit are likely allowed (Planning Act s. 35.1 and the municipal by-law).
  • +12Multiplex. Potentially suitable for up to 6 units (Toronto Sixplex Overlay).
  • +8Garden or laneway suite. A garden suite in the yard is likely allowed.

How the score worksNot an appraisal or zoning opinion.

Lot outlined from the municipality's parcel data (approximate, not a survey). Neighbouring lots in grey.

Generated November 1, 2026 from public open data on LSG Realty's own servers. Public records; not a legal, zoning or engineering opinion.

Check another addressExplore the map

Lot

Information: Lot of about 186 m²

  • Lot area: 186 m² · 0.046 acres · 2,001 sq ft (as stated in the parcel record)
  • About 6.1 m wide and 30.4 m deep (estimated from the lot lines)
  • Lot lines are approximate and not a survey.

Source: City of Toronto, Property Boundaries (2026-10-30). Public records; not a legal, zoning or engineering opinion.

Zoning

Information: Zoned R · Residential

  • Category: Residential
  • Zone label: R (f4.5; d1.0) (x835)
  • Zoning shown for reference only. The by-law text governs; confirm with the municipality.

Source: City of Toronto, Zoning By-law 569-2013 (open data) (2026-02-20). Public records; not a legal, zoning or engineering opinion.

Second units and garden suites

Favourable: Garden suite: likely allowed

  • Likely allows additional units
  • Second unit: likely allowed · Third unit: likely allowed
  • Garden suite: likely allowed · Laneway suite: not likely
  • Up to 2 additional units per lot in this municipality
  • No public lane found along the lot (a laneway suite needs 3.5 m of lot line on a lane)
  • Screening from open data and the municipal by-law; not a zoning opinion. Confirm with the municipality.

Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-31); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, Toronto Centreline (public lanes) (2026-10-30); City of Toronto, Ravine & Natural Feature Protection area (2026-11-01); York Region, Parcel (property boundaries across York Region) (2026-11-01); York Region, Regional Official Plan 2022, Map 1 (Urban Area, Towns and Villages) (2026-11-01); Town of Newmarket, Zoning By-laws 2010-40 and 2019-06 (2026-10-10); Statistics Canada, 2021 Census census subdivisions (cartographic boundary file) (2026-11-01); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-11-01); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-11-01); Province of Ontario, Oak Ridges Moraine land use designations (2017 Plan) (2026-11-01); Province of Ontario, Greenbelt designations (2017 Plan) (2026-11-01). Public records; not a legal, zoning or engineering opinion.

Multiplex potential

Favourable: Multiplex: up to 6 units, potentially suitable

  • Potentially suitable
  • Up to 6 units under the City's multiplex rules (Sixplex Overlay)
  • Preliminary screening from open data. Not a zoning opinion or development approval. Confirm with the City and a qualified professional.

Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-30); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, City Wards (25-ward model) (2026-02-20); City of Toronto, Heritage Register (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-09-01); City of Toronto, Ravine & Natural Feature Protection area (last refreshed by the City Jul 23, 2019) (2019-07-23); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-10-31). Public records; not a legal, zoning or engineering opinion.

Severance potential

Limits apply: Severance: unlikely

  • Severance unlikely
  • Zone R (f4.5; d1.0) (x835): minimum lot frontage 4.5 m
  • Estimated frontage 6.1 m: 1.4× the minimum (two lots need 2×)
  • Lot area 186 m²
  • Frontage is under twice the zone's minimum
  • Frontage is estimated from the lot lines, not surveyed.
  • Approved severance: 233 College St (300 m) · 2021-07-07 · file B0070/20TEY
  • Approved severance: 41 D'Arcy St (330 m) · 2024-06-12 · file B0016/24TEY
  • Approved severance: 141 Mc Caul St (500 m) · 2020-09-02 · file B0018/20TEY
  • Needs Committee of Adjustment approval; not a planning opinion.

Source: City of Toronto, Property Boundaries (2026-10-30); City of Toronto, Zoning By-law 569-2013 (open data) (2026-02-20); City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.

Variance odds (Committee of Adjustment)

Favourable: 90% of 179 minor variances within 1 km approved (5 years)

  • Within 1 km, last 3 years: 106 decisions: 88% approved (88% approved, 0% with conditions, 9% refused, 3% withdrawn)
  • Within 1 km, last 5 years: 179 decisions: 90% approved (90% approved, 0% with conditions, 8% refused, 2% withdrawn)
  • Ward 11, last 3 years: 480 decisions: 87% approved (87% approved, 0% with conditions, 8% refused, 5% withdrawn)
  • Ward 11, last 5 years: 892 decisions: 89% approved (89% approved, <1% with conditions, 7% refused, 4% withdrawn)
  • Typical time from application to decision: 13 weeks (median of 176)
  • Named in the application (1 km, 5 years): parking 26 (81% approved); garden or laneway suite 21 (81% approved); floor space index / gross floor area 8; building height 7; 129 name no category
  • Conditions: 0 of 161 approvals within 1 km are recorded as conditional. The City's open data does not publish the conditions; read the decision.
  • 114 Baldwin St (0 m) · Refused 2025-01-29 · file A0948/24TEY · parking
  • 119 Baldwin St (40 m) · Approved 2023-04-26 · file A0125/23TEY · parking
  • 131 Baldwin St (70 m) · Approved 2024-06-12 · file A0341/24TEY
  • 122 D'Arcy St (120 m) · Approved 2026-07-15 · file A0100/26TEY · garden or laneway suite
  • 116 D'Arcy St (130 m) · Approved 2024-08-28 · file A0475/24TEY
  • Past decisions don't predict future ones; not a planning opinion.

Source: City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.

Flood, Moraine and Greenbelt

Favourable: Outside mapped flood and hazard areas

  • Not within a conservation authority's mapped regulated area (flooding, erosion, wetlands). Mapping is approximate.
  • Outside the Oak Ridges Moraine Conservation Plan area.
  • Outside the Greenbelt Plan area.

Source: Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-04-29); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-10-31); Credit Valley Conservation, Generic Regulations Limit (2025) (2026-10-27); Central Lake Ontario Conservation Authority, CLOCA Regulated Areas (natural hazards regulation mapping, Nov 2025) (2026-10-31); Hamilton Conservation Authority, HCA Regulated Areas (O. Reg. 41/24) (2026-08-04); Province of Ontario, Oak Ridges Moraine: land use designations (Oak Ridges Moraine Conservation Plan, 2017) (2026-10-31); Province of Ontario, Greenbelt designations (Greenbelt Plan, 2017) (2026-10-31); Province of Ontario, Wetlands (Land Information Ontario): Provincially Significant Wetlands and other evaluated wetlands (2026-10-31); Province of Ontario, Areas of Natural and Scientific Interest (ANSI), life science and earth science (Land Information Ontario) (2026-10-31); Province of Ontario, Wooded Area (Land Information Ontario): mapped woodland cover, not a significance determination (2026-10-31). Public records; not a legal, zoning or engineering opinion.

Water and sewer capacity

Information: Municipal water and sewer (no allocation published)

  • City of Toronto: Toronto Water treats and distributes drinking water and collects and treats wastewater across the city. No servicing allocation system is published.
  • Published figure: Not published
  • Based on: City of Toronto, Toronto Water (2026-11-01)
  • Public records; confirm with the municipality.

Source: City of Toronto, City of Toronto, Toronto Water (2026-11-01); Province of Ontario (Land Information Ontario), Municipal Boundary – Lower and Single Tier (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Urban Area (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Towns and Villages (2026-11-01). Public records; not a legal, zoning or engineering opinion.

Transit and station areas

Favourable: In a station area · Queen's Park 750 m

  • Nearest rapid transit or GO station: Queen's Park (Line 1), 750 m in a straight line
  • 3 stations within 1 km
  • Inside the St Patrick Protected Major Transit Station Area. Station area boundaries and density targets come from the Official Plan. Confirm with the municipality.

Source: City of Toronto, Merged GTFS – TTC Routes and Schedules (subway and LRT routes, their shapes and the stations they serve) (2026-11-01); Province of Ontario, Ontario Railway Network (ORWN) track and station, filtered to GO Transit (Land Information Ontario; 2016 attribute vintage) (2026-10-31); York Region, Regional Official Plan 2022, Map 10 – Rapid Transit Network (proposed subway service and stations) (2026-10-31); City of Toronto, Minister-Approved Major Transit Station Areas (MTSA and Protected MTSA delineations) (2026-02-03); York Region, Regional Official Plan 2022, Appendix 2 – Major Transit Station Areas (boundaries and minimum density targets) (2026-10-31); Durham Region, Regional Official Plan (2024 consolidation), Map 3 – Protected Major Transit Station Areas (2026-10-31); City of Brampton, Brampton Plan, Schedule 1B – Primary Major Transit Station Areas (2026-06-11). Public records; not a legal, zoning or engineering opinion.

Commute

Favourable: Union Station: under 20 min by car, under 40 min by transit

  • To Union Station: under 20 min by car · under 40 min by transit
  • To Highway 404 / 407: under 60 min by car · over 60 min by transit
  • Typical weekday morning, estimated from open road and transit schedule data (not live traffic or a trip planner).

Source: LSG commute estimate, Roads © OpenStreetMap contributors (ODbL); LSG commute estimate, TTC schedules: City of Toronto, Open Government Licence – Toronto; LSG commute estimate, Data used in this product or service is provided with the permission of Metrolinx. Public records; not a legal, zoning or engineering opinion.

Schools nearby

Information: Nearest elementary school: Beverley School, 160 m

  • Beverley School (Elementary, 160 m) · Toronto DSB
  • Subway Academy II (Secondary, 160 m) · Toronto DSB
  • Heydon Park Secondary School (Secondary, 260 m) · Toronto DSB
  • da Vinci School (Elementary, 520 m) · Toronto DSB
  • Lord Lansdowne Junior Public School (Elementary, 520 m) · Toronto DSB
  • Contact Alternative School School (Secondary, 610 m) · Toronto DSB
  • The nearest school is not always the one that serves an address: use the board's locator. Boundaries change; confirm with the board.

Source: Ontario Ministry of Education, Ontario public school contact information (placed by Statistics Canada ODA addresses). Public records; not a legal, zoning or engineering opinion.

Child care

Information: 22 licensed child care centres within 1 km

  • Nearest: Children'S Primary Centre (280 m) · 177 Beverley Street, Toronto, ON M5T 1Y7
  • Licence status as of the ministry's latest monthly file. Ask the centre about spaces and fees.

Source: Ontario Ministry of Education, Licensed child care facilities in Ontario (2026-09-01). Public records; not a legal, zoning or engineering opinion.

Active development applications

Information: 15 active applications within 500 m

  • Consent (Committee of Adjustment) · 130 D'Arcy St (120 m) · Accepted · B0053/26TEY
  • Minor variance (Committee of Adjustment) · 6 Nassau St (210 m) · TLAB Appeal · A0250/21TEY
  • Minor variance (Committee of Adjustment) · 202 Beverley St (240 m) · Postponed · A0951/24TEY
  • Consent (Committee of Adjustment) · 33 Kensington Ave (280 m) · Postponed · B0039/20TEY
  • Minor variance (Committee of Adjustment) · 403 Dundas St W (330 m) · Postponed · A0011/24TEY
  • From the municipality's open data. Check the municipality's file for the latest status.

Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.

Upcoming residential projects

Information: 27 upcoming residential projects within 1 km

  • 17 St Andrew St (220 m) · Under construction: 5-storey, 72-unit rental building
  • 571 Dundas St W (and 2 more addresses) (390 m) · Approved: residential subdivision (units not published)
  • 100 Beverley St (410 m) · Under construction: 3-storey, 12-unit rental building
  • 191 College St (and 6 more addresses) (430 m) · Proposed: 31-storey, 492-unit rental building
  • 502 Spadina Ave (and 1 more address) (440 m) · Proposed: 9-storey, 109-unit rental building
  • From municipal open data. Not a listing or an offer to sell; details change. Confirm with the municipality.

Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.

Building permits nearby

Information: 40 building permits within 250 m since 2024

  • Addition / alteration · 315 Spadina Ave (140 m) · 2026-10-05 · Inspection
  • Addition / alteration · 315 Spadina Ave (140 m) · 2026-09-08 · Permit Issued
  • Addition / alteration · 103 Baldwin St (90 m) · 2026-09-02 · Revision Issued
  • New building · 17 St Andrew St (220 m) · 2026-07-30 · Permit Issued
  • Addition / alteration · 394 Spadina Ave (150 m) · 2026-07-08 · Permit Issued
  • From the municipality's open data. Check with the municipality for the permit's current status.

Source: City of Toronto, Building Permits – Active Permits (2026-10-30); City of Toronto, Building Permits – Cleared Permits (2026-10-30); City of Mississauga, Building Permits (issued since 2018) (2026-10-01); City of Brampton, Building Permits (GeoHub) (2026-10-31). Public records; not a legal, zoning or engineering opinion.

Official Plan

Not available: Official Plan designation not available here

Public records; not a legal, zoning or engineering opinion.

Neighbourhood profile

Information: Median household income $52k

  • Median household income (2020): $51,600
  • Owner households: 14%
  • Households with children: 8%
  • Median age: 31.4
  • Population density: 8,411 per km²
  • Statistics Canada, Census of Population 2021 (income is for 2020), for the dissemination area around this address.

Source: Statistics Canada, Census of Population 2021, Census Profile and dissemination area boundaries (2022-04-27). Public records; not a legal, zoning or engineering opinion.