Lot
Information: Lot of about 3,521 m²
- Lot area: 3,521 m² · 0.87 acres · 37,900 sq ft (as stated in the parcel record)
- About 46.9 m wide and 79.8 m deep (estimated from the lot lines)
- Lot lines are approximate and not a survey.
Source: City of Toronto, Property Boundaries (2026-10-30). Public records; not a legal, zoning or engineering opinion.
Zoning
Information: Zoned · Mixed use
- Category: Mixed use
- Zone label: (H) CR 1.0 (c1.0; r1.0) SS2 (x783)
- Zoning shown for reference only. The by-law text governs; confirm with the municipality.
Zoning by-law
Source: City of Toronto, Zoning By-law 569-2013 (open data) (2026-02-20). Public records; not a legal, zoning or engineering opinion.
Second units and garden suites
Limits apply: Additional units: not likely
- Unlikely
- Second unit: not likely · Third unit: not likely
- Garden suite: not likely · Laneway suite: not likely
- Up to 2 additional units per lot in this municipality
- Not a residential zone: the permission is for detached, semi-detached and row houses
- Screening from open data and the municipal by-law; not a zoning opinion. Confirm with the municipality.
Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-31); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, Toronto Centreline (public lanes) (2026-10-30); City of Toronto, Ravine & Natural Feature Protection area (2026-11-01); York Region, Parcel (property boundaries across York Region) (2026-11-01); York Region, Regional Official Plan 2022, Map 1 (Urban Area, Towns and Villages) (2026-11-01); Town of Newmarket, Zoning By-laws 2010-40 and 2019-06 (2026-10-10); Statistics Canada, 2021 Census census subdivisions (cartographic boundary file) (2026-11-01); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-11-01); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-11-01); Province of Ontario, Oak Ridges Moraine land use designations (2017 Plan) (2026-11-01); Province of Ontario, Greenbelt designations (2017 Plan) (2026-11-01). Public records; not a legal, zoning or engineering opinion.
Multiplex potential
Limits apply: Multiplex: apparently unsuitable
- Apparently unsuitable
- Not a residential zone
- Preliminary screening from open data. Not a zoning opinion or development approval. Confirm with the City and a qualified professional.
Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-30); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, City Wards (25-ward model) (2026-02-20); City of Toronto, Heritage Register (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-09-01); City of Toronto, Ravine & Natural Feature Protection area (last refreshed by the City Jul 23, 2019) (2019-07-23); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Severance potential
Limits apply: Severance: unlikely
- Severance unlikely
- Estimated frontage 46.9 m
- Lot area 3,521 m²
- Not a low-rise residential zone (R, RD, RS, RT or RM)
- Frontage is estimated from the lot lines, not surveyed.
- Approved severance: 175 Cocksfield Ave (190 m) · 2018-01-11 · file B0055/17NY
- Approved severance: 28 Goddard St (220 m) · 2021-11-18 · file B0003/21NY
- Approved severance: 30 Goddard St (240 m) · 2021-11-18 · file B0004/21NY
- Needs Committee of Adjustment approval; not a planning opinion.
How severances work in Toronto
Source: City of Toronto, Property Boundaries (2026-10-30); City of Toronto, Zoning By-law 569-2013 (open data) (2026-02-20); City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Variance odds (Committee of Adjustment)
Favourable: 95% of 75 minor variances within 1 km approved (5 years)
- Within 1 km, last 3 years: 42 decisions: 95% approved (93% approved, 2% with conditions, 5% refused, 0% withdrawn)
- Within 1 km, last 5 years: 75 decisions: 95% approved (92% approved, 3% with conditions, 5% refused, 0% withdrawn)
- Ward 6, last 3 years: 179 decisions: 92% approved (87% approved, 5% with conditions, 7% refused, 1% withdrawn)
- Ward 6, last 5 years: 345 decisions: 92% approved (88% approved, 4% with conditions, 8% refused, 1% withdrawn)
- Typical time from application to decision: 10 weeks (median of 75)
- Named in the application (1 km, 5 years): parking 5; lot frontage / lot area 5; garden or laneway suite 3; building height 2; 62 name no category
- Conditions: 2 of 71 approvals within 1 km are recorded as conditional. The City's open data does not publish the conditions; read the decision.
- 146 Alexis Blvd (70 m) · Approved 2022-09-22 · file A0463/22NY
- 126 Gorman Park Rd (70 m) · Refused 2026-09-17 · file A0230/26NY · lot frontage / lot area
- 126 Gorman Park Rd (70 m) · Refused 2026-09-17 · file A0237/26NY · lot frontage / lot area
- 800 Sheppard Ave W (80 m) · Approved 2026-10-15 · file A0318/26NY
- 824 Sheppard Ave W (160 m) · Approved 2026-01-22 · file A0502/25NY · building height, parking
- Past decisions don't predict future ones; not a planning opinion.
Variance odds by categoryCity's Application Information Centre
Source: City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Flood, Moraine and Greenbelt
Favourable: Outside mapped flood and hazard areas
- Not within a conservation authority's mapped regulated area (flooding, erosion, wetlands). Mapping is approximate.
- Outside the Oak Ridges Moraine Conservation Plan area.
- Outside the Greenbelt Plan area.
Source: Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-04-29); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-10-31); Credit Valley Conservation, Generic Regulations Limit (2025) (2026-10-27); Central Lake Ontario Conservation Authority, CLOCA Regulated Areas (natural hazards regulation mapping, Nov 2025) (2026-10-31); Hamilton Conservation Authority, HCA Regulated Areas (O. Reg. 41/24) (2026-08-04); Province of Ontario, Oak Ridges Moraine: land use designations (Oak Ridges Moraine Conservation Plan, 2017) (2026-10-31); Province of Ontario, Greenbelt designations (Greenbelt Plan, 2017) (2026-10-31); Province of Ontario, Wetlands (Land Information Ontario): Provincially Significant Wetlands and other evaluated wetlands (2026-10-31); Province of Ontario, Areas of Natural and Scientific Interest (ANSI), life science and earth science (Land Information Ontario) (2026-10-31); Province of Ontario, Wooded Area (Land Information Ontario): mapped woodland cover, not a significance determination (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Water and sewer capacity
Information: Municipal water and sewer (no allocation published)
- City of Toronto: Toronto Water treats and distributes drinking water and collects and treats wastewater across the city. No servicing allocation system is published.
- Published figure: Not published
- Based on: City of Toronto, Toronto Water (2026-11-01)
- Public records; confirm with the municipality.
The report
Source: City of Toronto, City of Toronto, Toronto Water (2026-11-01); Province of Ontario (Land Information Ontario), Municipal Boundary – Lower and Single Tier (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Urban Area (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Towns and Villages (2026-11-01). Public records; not a legal, zoning or engineering opinion.
Transit and station areas
Information: Sheppard West station 1.1 km away
- Nearest rapid transit or GO station: Sheppard West (Line 1), 1.1 km in a straight line
Source: City of Toronto, Merged GTFS – TTC Routes and Schedules (subway and LRT routes, their shapes and the stations they serve) (2026-11-01); Province of Ontario, Ontario Railway Network (ORWN) track and station, filtered to GO Transit (Land Information Ontario; 2016 attribute vintage) (2026-10-31); York Region, Regional Official Plan 2022, Map 10 – Rapid Transit Network (proposed subway service and stations) (2026-10-31); City of Toronto, Minister-Approved Major Transit Station Areas (MTSA and Protected MTSA delineations) (2026-02-03); York Region, Regional Official Plan 2022, Appendix 2 – Major Transit Station Areas (boundaries and minimum density targets) (2026-10-31); Durham Region, Regional Official Plan (2024 consolidation), Map 3 – Protected Major Transit Station Areas (2026-10-31); City of Brampton, Brampton Plan, Schedule 1B – Primary Major Transit Station Areas (2026-06-11). Public records; not a legal, zoning or engineering opinion.
Commute
Favourable: Union Station: under 40 min by car, under 60 min by transit
- To Union Station: under 40 min by car · under 60 min by transit
- To Highway 404 / 407: under 40 min by car · over 60 min by transit
- Typical weekday morning, estimated from open road and transit schedule data (not live traffic or a trip planner).
Source: LSG commute estimate, Roads © OpenStreetMap contributors (ODbL); LSG commute estimate, TTC schedules: City of Toronto, Open Government Licence – Toronto; LSG commute estimate, Data used in this product or service is provided with the permission of Metrolinx. Public records; not a legal, zoning or engineering opinion.
Schools nearby
Information: Nearest elementary school: Dublin Heights Elementary and Middle School, 470 m
- Dublin Heights Elementary and Middle School (Elementary, 470 m) · Toronto DSB
- St Robert Catholic School (Elementary, 560 m) · Toronto CDSB
- William Lyon Mackenzie Collegiate Institute (Secondary, 1 km) · Toronto DSB
- Faywood Arts-Based Curriculum School (Elementary, 1.5 km) · Toronto DSB
- The nearest school is not always the one that serves an address: use the board's locator. Boundaries change; confirm with the board.
TDSB school locator (Toronto District School Board)TCDSB school locator (Toronto Catholic District School Board)
Source: Ontario Ministry of Education, Ontario public school contact information (placed by Statistics Canada ODA addresses). Public records; not a legal, zoning or engineering opinion.
Parks
Information: Nearest park: Ellison Park, 640 m
- 3 parks and green spaces within 800 m
Source: City of Toronto, Green Spaces (2026-10-27); City of Brampton, Parks (2026-10-19); City of Brampton, Recreational Trails (2026-10-19); City of Ottawa, Parks and Greenspace (2026-10-31); OpenStreetMap, Parks, nature reserves and conservation areas (2026-10-29); OpenStreetMap, Named paths, trails and cycleways (2026-10-29). Public records; not a legal, zoning or engineering opinion.
Child care
Information: 8 licensed child care centres within 1 km
- Nearest: The Toronto Heschel School (150 m) · 819 Sheppard Avenue, Toronto, ON M3H 2T3
- Licence status as of the ministry's latest monthly file. Ask the centre about spaces and fees.
Source: Ontario Ministry of Education, Licensed child care facilities in Ontario (2026-09-01). Public records; not a legal, zoning or engineering opinion.
Active development applications
Information: 13 active applications within 500 m
- Minor variance (Committee of Adjustment) · 800 Sheppard Ave W (80 m) · Approved · A0318/26NY
- Official plan and/or zoning by-law amendment · 815 Sheppard Ave W (and 2 more addresses) (90 m) · Under Review · 22 163129 NNY 06 OZ
- Minor variance (Committee of Adjustment) · 7 Goddard St (170 m) · Hearing Scheduled · A0295/17NY
- Consent (Committee of Adjustment) · 7 Goddard St (170 m) · Hearing Scheduled · B0033/17NY
- Minor variance (Committee of Adjustment) · 7 Goddard St (170 m) · Hearing Scheduled · A0294/17NY
- From the municipality's open data. Check the municipality's file for the latest status.
Official plan and/or zoning by-law amendment · 815 Sheppard Ave W (and 2 more addresses)
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Upcoming residential projects
Information: 6 upcoming residential projects within 1 km
- 815 Sheppard Ave W (and 2 more addresses) (90 m) · Proposed: 11-storey, 71-unit rental building
- 179-181 Cocksfield Ave (and 2 more addresses) (210 m) · Approved: rental building, up to 14 storeys (units not published)
- 740 Sheppard Ave W (and 2 more addresses) (250 m) · Proposed: 9-storey, 70-unit mixed-use building
- 667 Sheppard Ave W (and 3 more addresses) (580 m) · Proposed: 11-storey, 291-unit mixed-use building
- 665 Sheppard Ave W (and 3 more addresses) (590 m) · Approved: 65-unit apartment building, up to 5 storeys
- From municipal open data. Not a listing or an offer to sell; details change. Confirm with the municipality.
815 Sheppard Ave W (and 2 more addresses)179-181 Cocksfield Ave (and 2 more addresses)740 Sheppard Ave W (and 2 more addresses)
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Building permits nearby
Information: 14 building permits within 250 m since 2024
- New building · 799 Sheppard Ave W (0 m) · 2026-10-06 · Revision Issued
- Addition / alteration · 10 Goddard St (150 m) · 2026-08-10 · Inspection
- New building · 151 Alexis Blvd (120 m) · 2026-07-28 · Inspection
- Addition / alteration · 160 Cocksfield Ave (200 m) · 2026-06-01 · Inspection
- Addition / alteration · 2 Norcross Rd (240 m) · 2026-05-11 · Inspection
- From the municipality's open data. Check with the municipality for the permit's current status.
Source: City of Toronto, Building Permits – Active Permits (2026-10-30); City of Toronto, Building Permits – Cleared Permits (2026-10-30); City of Mississauga, Building Permits (issued since 2018) (2026-10-01); City of Brampton, Building Permits (GeoHub) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Heritage
Favourable: No heritage status found
- Not found on the City's Heritage Register or in a Heritage Conservation District.
- Heritage status limits changes; confirm with the municipality.
Source: City of Toronto, Heritage Register (listed properties, and properties designated under Part IV or Part V of the Ontario Heritage Act) (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-06-23). Public records; not a legal, zoning or engineering opinion.
Official Plan
Not available: Official Plan designation not available here
Public records; not a legal, zoning or engineering opinion.
Contaminated sites
Favourable: No federal contaminated sites within 500 m
- From government records. Absence from this map doesn't mean a site is clean; get a Phase I ESA.
Source: Treasury Board of Canada Secretariat, Federal Contaminated Sites Inventory (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Neighbourhood profile
Information: Median household income $98k
- Median household income (2020): $98,000
- Owner households: 72%
- Households with children: 37%
- Median age: 38
- Population density: 5,016 per km²
- Statistics Canada, Census of Population 2021 (income is for 2020), for the dissemination area around this address.
Source: Statistics Canada, Census of Population 2021, Census Profile and dissemination area boundaries (2022-04-27). Public records; not a legal, zoning or engineering opinion.