Lot
Information: Lot of about 233 m²
- Lot area: 233 m² · 0.058 acres · 2,505 sq ft (as stated in the parcel record)
- About 8.3 m wide and 27.9 m deep (estimated from the lot lines)
- Lot lines are approximate and not a survey.
Source: City of Toronto, Property Boundaries (2026-10-30). Public records; not a legal, zoning or engineering opinion.
Zoning
Information: Zoned RM · Residential Multiple Dwelling
- Category: Residential
- Zone label: RM (f12.0; u4; d0.8) (x252)
- Zoning shown for reference only. The by-law text governs; confirm with the municipality.
Zoning by-law
Source: City of Toronto, Zoning By-law 569-2013 (open data) (2026-02-20). Public records; not a legal, zoning or engineering opinion.
Second units and garden suites
Check: Second unit: likely allowed
- Likely, with constraints
- Second unit: likely allowed · Third unit: likely allowed
- Garden suite: possible; needs a check · Laneway suite: not likely
- Up to 2 additional units per lot in this municipality
- Estimated lot depth under 30 m: the rear yard may be too short for a garden suite
- No public lane found along the lot (a laneway suite needs 3.5 m of lot line on a lane)
- Screening from open data and the municipal by-law; not a zoning opinion. Confirm with the municipality.
Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-31); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, Toronto Centreline (public lanes) (2026-10-30); City of Toronto, Ravine & Natural Feature Protection area (2026-11-01); York Region, Parcel (property boundaries across York Region) (2026-11-01); York Region, Regional Official Plan 2022, Map 1 (Urban Area, Towns and Villages) (2026-11-01); Town of Newmarket, Zoning By-laws 2010-40 and 2019-06 (2026-10-10); Statistics Canada, 2021 Census census subdivisions (cartographic boundary file) (2026-11-01); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-11-01); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-11-01); Province of Ontario, Oak Ridges Moraine land use designations (2017 Plan) (2026-11-01); Province of Ontario, Greenbelt designations (2017 Plan) (2026-11-01). Public records; not a legal, zoning or engineering opinion.
Multiplex potential
Favourable: Multiplex: up to 4 units, potentially suitable
- Potentially suitable
- Up to 4 units under the City's multiplex rules
- Preliminary screening from open data. Not a zoning opinion or development approval. Confirm with the City and a qualified professional.
Source: City of Toronto, Property Boundaries (lot outlines and stated lot area) (2026-10-30); City of Toronto, Zoning By-law 569-2013 (Zoning Area) (2026-02-20); City of Toronto, City Wards (25-ward model) (2026-02-20); City of Toronto, Heritage Register (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-09-01); City of Toronto, Ravine & Natural Feature Protection area (last refreshed by the City Jul 23, 2019) (2019-07-23); Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Severance potential
Limits apply: Severance: unlikely
- Severance unlikely
- Zone RM (f12.0; u4; d0.8) (x252): minimum lot frontage 12 m
- Estimated frontage 8.3 m: 0.7× the minimum (two lots need 2×)
- Lot area 233 m²
- Frontage is under twice the zone's minimum
- Frontage is estimated from the lot lines, not surveyed.
- Approved severance: 38 Rockcliffe Blvd (190 m) · 2020-11-05 · file B0006/20EYK
- Approved severance: 38 Rockcliffe Blvd (190 m) · 2022-04-05 · file B0041/21EYK
- Approved severance: 136 Lambton Ave (400 m) · 2025-11-06 · file B0019/25EYK
- Needs Committee of Adjustment approval; not a planning opinion.
How severances work in Toronto
Source: City of Toronto, Property Boundaries (2026-10-30); City of Toronto, Zoning By-law 569-2013 (open data) (2026-02-20); City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Variance odds (Committee of Adjustment)
Favourable: 94% of 65 minor variances within 1 km approved (5 years)
- Within 1 km, last 3 years: 38 decisions: 92% approved (92% approved, 0% with conditions, 5% refused, 3% withdrawn)
- Within 1 km, last 5 years: 65 decisions: 94% approved (94% approved, 0% with conditions, 3% refused, 3% withdrawn)
- Ward 5, last 3 years: 267 decisions: 88% approved (88% approved, 0% with conditions, 7% refused, 4% withdrawn)
- Ward 5, last 5 years: 492 decisions: 88% approved (88% approved, 0% with conditions, 7% refused, 4% withdrawn)
- Typical time from application to decision: 11 weeks (median of 63)
- Named in the application (1 km, 5 years): garden or laneway suite 5; side yard setback 2; parking 2; building height 1; 56 name no category
- Conditions: 0 of 61 approvals within 1 km are recorded as conditional. The City's open data does not publish the conditions; read the decision.
- 76 Greendale Ave (0 m) · Approved 2025-04-17 · file A0095/25EYK
- 43 Greendale Ave (130 m) · Approved 2022-06-30 · file A0285/22EYK
- 39 Greendale Ave (150 m) · Approved 2024-05-09 · file A0153/24EYK
- 20 Guestville Ave (180 m) · Approved 2026-03-12 · file A0352/23EYK
- 38 Rockcliffe Blvd (190 m) · Refused 2026-02-26 · file A0480/25EYK
- Past decisions don't predict future ones; not a planning opinion.
Variance odds by categoryCity's Application Information Centre
Source: City of Toronto, Committee of Adjustment Applications (Closed Applications since 2017) (2026-10-31); City of Toronto, Committee of Adjustment Applications (Active Applications: decided, in the appeal period) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Flood, Moraine and Greenbelt
Favourable: Outside mapped flood and hazard areas
- Not within a conservation authority's mapped regulated area (flooding, erosion, wetlands). Mapping is approximate.
- Outside the Oak Ridges Moraine Conservation Plan area.
- Outside the Greenbelt Plan area.
Source: Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-04-29); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-10-31); Credit Valley Conservation, Generic Regulations Limit (2025) (2026-10-27); Central Lake Ontario Conservation Authority, CLOCA Regulated Areas (natural hazards regulation mapping, Nov 2025) (2026-10-31); Hamilton Conservation Authority, HCA Regulated Areas (O. Reg. 41/24) (2026-08-04); Province of Ontario, Oak Ridges Moraine: land use designations (Oak Ridges Moraine Conservation Plan, 2017) (2026-10-31); Province of Ontario, Greenbelt designations (Greenbelt Plan, 2017) (2026-10-31); Province of Ontario, Wetlands (Land Information Ontario): Provincially Significant Wetlands and other evaluated wetlands (2026-10-31); Province of Ontario, Areas of Natural and Scientific Interest (ANSI), life science and earth science (Land Information Ontario) (2026-10-31); Province of Ontario, Wooded Area (Land Information Ontario): mapped woodland cover, not a significance determination (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Water and sewer capacity
Information: Municipal water and sewer (no allocation published)
- City of Toronto: Toronto Water treats and distributes drinking water and collects and treats wastewater across the city. No servicing allocation system is published.
- Published figure: Not published
- Based on: City of Toronto, Toronto Water (2026-11-01)
- Public records; confirm with the municipality.
The report
Source: City of Toronto, City of Toronto, Toronto Water (2026-11-01); Province of Ontario (Land Information Ontario), Municipal Boundary – Lower and Single Tier (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Urban Area (2026-11-01); York Region, Regional Official Plan 2022, Map 1 – Regional Structure: Towns and Villages (2026-11-01). Public records; not a legal, zoning or engineering opinion.
Transit and station areas
Information: Mount Dennis station 980 m away
- Nearest rapid transit or GO station: Mount Dennis (Line 5), 980 m in a straight line
Source: City of Toronto, Merged GTFS – TTC Routes and Schedules (subway and LRT routes, their shapes and the stations they serve) (2026-11-01); Province of Ontario, Ontario Railway Network (ORWN) track and station, filtered to GO Transit (Land Information Ontario; 2016 attribute vintage) (2026-10-31); York Region, Regional Official Plan 2022, Map 10 – Rapid Transit Network (proposed subway service and stations) (2026-10-31); City of Toronto, Minister-Approved Major Transit Station Areas (MTSA and Protected MTSA delineations) (2026-02-03); York Region, Regional Official Plan 2022, Appendix 2 – Major Transit Station Areas (boundaries and minimum density targets) (2026-10-31); Durham Region, Regional Official Plan (2024 consolidation), Map 3 – Protected Major Transit Station Areas (2026-10-31); City of Brampton, Brampton Plan, Schedule 1B – Primary Major Transit Station Areas (2026-06-11). Public records; not a legal, zoning or engineering opinion.
Commute
Favourable: Union Station: under 40 min by car, under 40 min by transit
- To Union Station: under 40 min by car · under 40 min by transit
- To Highway 404 / 407: under 40 min by car · over 60 min by transit
- Typical weekday morning, estimated from open road and transit schedule data (not live traffic or a trip planner).
Source: LSG commute estimate, Roads © OpenStreetMap contributors (ODbL); LSG commute estimate, TTC schedules: City of Toronto, Open Government Licence – Toronto; LSG commute estimate, Data used in this product or service is provided with the permission of Metrolinx. Public records; not a legal, zoning or engineering opinion.
Everyday needs
Favourable: Everyday Needs score 87/100 (walk 79, drive 94)
- Everyday Needs score 87/100: walking 79, driving 94 (most needs close by)
- Grocery store: 8 min walk (Food Basics) · 2 min by car
- Pharmacy: 8 min walk (Jane Park Pharmacy) · 2 min by car
- Transit stop: 2 min walk (Rockcliffe Blvd at Caesar Ave North Side (TTC))
- Shopping centre: 24 min walk (Marshalls) · 6 min by car (Winners)
- Emergency department: over 60 min walk · 15 min by car (Hennick Humber Hospital)
- Hospital: 25 min walk (Runnymede Healthcare Centre) · 6 min by car
- LSG estimate from open data: walking on mapped streets and paths at 4.8 km/h; driving at typical weekday rush-hour road speeds (not live traffic). Times are for the 200 m square around each address. Places can open, close or move; check before you rely on one.
- Places and paths © OpenStreetMap contributors, ODbL.
Source: LSG Realty, Everyday Needs score (LSG's own travel-time estimate) (2026-11-02); © OpenStreetMap contributors, ODbL, OpenStreetMap (Geofabrik Ontario extract): roads, footpaths, supermarkets and grocery stores, pharmacies, shopping centres and department stores, hospitals and emergency departments — Open Database Licence (ODbL) 1.0 (2026-11-02); Ontario Ministry of Health, Ministry of Health Service Provider Locations (MOHSERLO): hospital sites — Open Government Licence – Ontario (2026-11-02); City of Toronto (TTC), Merged GTFS – TTC Routes and Schedules (stops) — Open Government Licence – Toronto (2026-11-02); Metrolinx (GO Transit), GO Transit GTFS (stops) — Metrolinx Open Data Licence (2026-11-02); Metrolinx (UP Express), UP Express GTFS (stops) — Metrolinx Open Data Licence (2026-11-02). Public records; not a legal, zoning or engineering opinion.
Schools nearby
Information: Nearest elementary school: Cordella Junior Public School, 150 m
- Cordella Junior Public School (Elementary, 150 m) · Toronto DSB
- Frank Oke Secondary School (Secondary, 260 m) · Toronto DSB
- Our Lady of Victory Catholic School (Elementary, 430 m) · Toronto CDSB
- Dennis Avenue Community School (Elementary, 540 m) · Toronto DSB
- St Oscar Romero Catholic Secondary School (Secondary, 660 m) · Toronto CDSB
- York Memorial Collegiate Institute (Secondary, 1.4 km) · Toronto DSB
- The nearest school is not always the one that serves an address: use the board's locator. Boundaries change; confirm with the board.
TDSB school locator (Toronto District School Board)TCDSB school locator (Toronto Catholic District School Board)
Source: Ontario Ministry of Education, Ontario public school contact information (placed by Statistics Canada ODA addresses). Public records; not a legal, zoning or engineering opinion.
Parks
Favourable: Nearest park: Westlake Park, 110 m
- 11 parks and green spaces within 800 m
Source: City of Toronto, Green Spaces (2026-10-27); City of Brampton, Parks (2026-10-19); City of Brampton, Recreational Trails (2026-10-19); City of Ottawa, Parks and Greenspace (2026-10-31); OpenStreetMap, Parks, nature reserves and conservation areas (2026-10-29); OpenStreetMap, Named paths, trails and cycleways (2026-10-29). Public records; not a legal, zoning or engineering opinion.
Child care
Information: 5 licensed child care centres within 1 km
- Nearest: Our Lady Of Victory Ymca (430 m) · 70 Guestville Avenue, Toronto, ON M6N 4N3
- Licence status as of the ministry's latest monthly file. Ask the centre about spaces and fees.
Source: Ontario Ministry of Education, Licensed child care facilities in Ontario (2026-09-01). Public records; not a legal, zoning or engineering opinion.
Active development applications
Information: No active applications within 500 m
- From the municipality's open data. Check the municipality's file for the latest status.
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Upcoming residential projects
Information: 9 upcoming residential projects within 1 km
- 72 Brownville Ave (and 16 more addresses) (720 m) · Proposed: apartment building, up to 43 storeys (units not published)
- 1175 Weston Rd (and 12 more addresses) (870 m) · Proposed: 38-storey, 382-unit mixed-use building
- 1177 Weston Rd (and 12 more addresses) (880 m) · Proposed: 382-unit mixed-use building, up to 48 storeys
- 15 Hollis St (and 4 more addresses) (890 m) · Proposed: 365-unit apartment building, up to 34 storeys
- 25 Photography Dr (890 m) · Proposed: 2,356-unit mixed-use building, up to 49 storeys
- From municipal open data. Not a listing or an offer to sell; details change. Confirm with the municipality.
72 Brownville Ave (and 16 more addresses)1175 Weston Rd (and 12 more addresses)1177 Weston Rd (and 12 more addresses)
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Building permits nearby
Information: 7 building permits within 250 m since 2024
- New building · 27 Rockcliffe Blvd (230 m) · 2026-09-11 · Revision Issued
- Demolition · 76 Greendale Ave (0 m) · 2026-05-08 · Permit Issued
- New building · 76 Greendale Ave (0 m) · 2026-05-06 · Inspection
- Addition / alteration · 16 Teston Blvd (250 m) · 2026-03-03 · Inspection
- Demolition · 27 Rockcliffe Blvd (230 m) · 2025-06-09 · Closed
- From the municipality's open data. Check with the municipality for the permit's current status.
Source: City of Toronto, Building Permits – Active Permits (2026-10-30); City of Toronto, Building Permits – Cleared Permits (2026-10-30); City of Mississauga, Building Permits (issued since 2018) (2026-10-01); City of Brampton, Building Permits (GeoHub) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Heritage
Favourable: No heritage status found
- Not found on the City's Heritage Register or in a Heritage Conservation District.
- Heritage status limits changes; confirm with the municipality.
Source: City of Toronto, Heritage Register (listed properties, and properties designated under Part IV or Part V of the Ontario Heritage Act) (2026-09-01); City of Toronto, Heritage Conservation Districts (2026-06-23). Public records; not a legal, zoning or engineering opinion.
Official Plan
Not available: Official Plan designation not available here
Public records; not a legal, zoning or engineering opinion.
Contaminated sites
Favourable: No federal contaminated sites within 500 m
- From government records. Absence from this map doesn't mean a site is clean; get a Phase I ESA.
Source: Treasury Board of Canada Secretariat, Federal Contaminated Sites Inventory (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Neighbourhood profile
Information: Median household income $88k
- Median household income (2020): $88,000
- Owner households: 67%
- Households with children: 43%
- Median age: 38.8
- Population density: 9,848 per km²
- Statistics Canada, Census of Population 2021 (income is for 2020), for the dissemination area around this address.
Source: Statistics Canada, Census of Population 2021, Census Profile and dissemination area boundaries (2022-04-27). Public records; not a legal, zoning or engineering opinion.