Lot
Information: Lot of about 2,293 m²
- Lot area: 2,293 m² · 0.57 acres · 24,682 sq ft (from the municipality's mapping)
- About 40.1 m wide and 64.1 m deep (estimated from the lot lines)
- Lot lines are approximate and not a survey.
Source: City of Mississauga, Parcels (2026-10-01). Public records; not a legal, zoning or engineering opinion.
Zoning
Not available: Zoning not in open data for Mississauga
- Ask the municipality's zoning desk, or read the zoning by-law map. The map has zoning for Toronto and Newmarket today.
Public records; not a legal, zoning or engineering opinion.
Second units and garden suites
Not available: Second-unit screening not available yet for this lot
- Ontario's Planning Act lets most urban house lots on municipal water and sewer have up to three units. Confirm with the municipality.
Public records; not a legal, zoning or engineering opinion.
Multiplex potential
Not available: Multiplex screening covers Toronto only
- Outside Toronto, see Second units and garden suites below.
Public records; not a legal, zoning or engineering opinion.
Flood, Moraine and Greenbelt
Favourable: Outside mapped flood and hazard areas
- Not within a conservation authority's mapped regulated area (flooding, erosion, wetlands). Mapping is approximate.
- Outside the Oak Ridges Moraine Conservation Plan area.
- Outside the Greenbelt Plan area.
Source: Toronto and Region Conservation Authority, TRCA Regulated Area (Regulation Limit 2025, O. Reg. 41/24) (2026-04-29); Lake Simcoe Region Conservation Authority, Regulation Limit (O. Reg. 41/24) (2026-10-31); Credit Valley Conservation, Generic Regulations Limit (2025) (2026-10-27); Central Lake Ontario Conservation Authority, CLOCA Regulated Areas (natural hazards regulation mapping, Nov 2025) (2026-10-31); Hamilton Conservation Authority, HCA Regulated Areas (O. Reg. 41/24) (2026-08-04); Province of Ontario, Oak Ridges Moraine: land use designations (Oak Ridges Moraine Conservation Plan, 2017) (2026-10-31); Province of Ontario, Greenbelt designations (Greenbelt Plan, 2017) (2026-10-31); Province of Ontario, Wetlands (Land Information Ontario): Provincially Significant Wetlands and other evaluated wetlands (2026-10-31); Province of Ontario, Areas of Natural and Scientific Interest (ANSI), life science and earth science (Land Information Ontario) (2026-10-31); Province of Ontario, Wooded Area (Land Information Ontario): mapped woodland cover, not a significance determination (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Water and sewer capacity
Not available: Servicing status covers York Region and Toronto
Public records; not a legal, zoning or engineering opinion.
Transit and station areas
Favourable: Port Credit GO station 110 m away
- Nearest rapid transit or GO station: Port Credit GO (Lakeshore West), 110 m in a straight line
Source: City of Toronto, Merged GTFS – TTC Routes and Schedules (subway and LRT routes, their shapes and the stations they serve) (2026-11-01); Province of Ontario, Ontario Railway Network (ORWN) track and station, filtered to GO Transit (Land Information Ontario; 2016 attribute vintage) (2026-10-31); York Region, Regional Official Plan 2022, Map 10 – Rapid Transit Network (proposed subway service and stations) (2026-10-31); City of Toronto, Minister-Approved Major Transit Station Areas (MTSA and Protected MTSA delineations) (2026-02-03); York Region, Regional Official Plan 2022, Appendix 2 – Major Transit Station Areas (boundaries and minimum density targets) (2026-10-31); Durham Region, Regional Official Plan (2024 consolidation), Map 3 – Protected Major Transit Station Areas (2026-10-31); City of Brampton, Brampton Plan, Schedule 1B – Primary Major Transit Station Areas (2026-06-11). Public records; not a legal, zoning or engineering opinion.
Commute
Favourable: Union Station: under 40 min by car, under 60 min by transit
- To Union Station: under 40 min by car · under 60 min by transit
- To Highway 404 / 407: under 60 min by car · over 60 min by transit
- Typical weekday morning, estimated from open road and transit schedule data (not live traffic or a trip planner).
Source: LSG commute estimate, Roads © OpenStreetMap contributors (ODbL); LSG commute estimate, TTC schedules: City of Toronto, Open Government Licence – Toronto; LSG commute estimate, Data used in this product or service is provided with the permission of Metrolinx. Public records; not a legal, zoning or engineering opinion.
Schools nearby
Information: Nearest elementary school: Forest Avenue Public School, 510 m
- Forest Avenue Public School (Elementary, 510 m) · Peel DSB
- Riverside Public School (Elementary, 610 m) · Peel DSB
- Port Credit Secondary School (Secondary, 850 m) · Peel DSB
- Kenollie Public School (Elementary, 910 m) · Peel DSB
- The nearest school is not always the one that serves an address: use the board's locator. Boundaries change; confirm with the board.
PDSB school locator (Peel District School Board)DPCDSB school locator (Dufferin-Peel Catholic District School Board)
Source: Ontario Ministry of Education, Ontario public school contact information (placed by Statistics Canada ODA addresses). Public records; not a legal, zoning or engineering opinion.
Parks
Favourable: Nearest park: Port Credit Memorial Park, 310 m
- 5 parks and green spaces within 800 m
Source: City of Toronto, Green Spaces (2026-10-27); City of Brampton, Parks (2026-10-19); City of Brampton, Recreational Trails (2026-10-19); City of Ottawa, Parks and Greenspace (2026-10-31); OpenStreetMap, Parks, nature reserves and conservation areas (2026-10-29); OpenStreetMap, Named paths, trails and cycleways (2026-10-29). Public records; not a legal, zoning or engineering opinion.
Child care
Information: 8 licensed child care centres within 1 km
- Nearest: Applewood/Rainbow Montessori School (270 m) · 24 Stavebank Road, Mississauga, ON L5G 2T5
- Licence status as of the ministry's latest monthly file. Ask the centre about spaces and fees.
Source: Ontario Ministry of Education, Licensed child care facilities in Ontario (2026-09-01). Public records; not a legal, zoning or engineering opinion.
Active development applications
Information: No active applications within 500 m
- From the municipality's open data. Check the municipality's file for the latest status.
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Upcoming residential projects
Information: No upcoming residential projects within 1 km
- From municipal open data. Not a listing or an offer to sell; details change. Confirm with the municipality.
Source: City of Toronto, Development Applications (City Planning, Application Information Centre) (2026-11-01); City of Toronto, Committee of Adjustment Applications (Active Applications) (2026-10-31); City of Brampton, GeoHub, Planning_Land_Use_Development: OPA ZBA Subdivision, Draft Plan of Condo, Site Plan Approval, Minor Variance, Consent to Sever (2026-11-01); York Region, Active Development Application Boundaries (York Region's review of applications in its nine municipalities) (2026-10-27). Public records; not a legal, zoning or engineering opinion.
Building permits nearby
Information: 12 building permits within 250 m since 2024
- Demolition · 50 High St E (180 m) · 2026-08-11 · Issued Permit
- Addition / alteration · 55 Park St E (130 m) · 2026-05-21 · Completed -All Insp Signed Off
- New building · 30 Queen St E (40 m) · 2026-04-14 · Completed -All Insp Signed Off
- Demolition · 23 Elizabeth St N (50 m) · 2025-12-02 · Issued Permit
- Demolition · 46 Park St E (60 m) · 2025-12-02 · Issued Permit
- From the municipality's open data. Check with the municipality for the permit's current status.
Source: City of Toronto, Building Permits – Active Permits (2026-10-30); City of Toronto, Building Permits – Cleared Permits (2026-10-30); City of Mississauga, Building Permits (issued since 2018) (2026-10-01); City of Brampton, Building Permits (GeoHub) (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Heritage
Not available: Heritage register data covers Toronto only
- Ask the municipality whether the property is on its heritage register.
Public records; not a legal, zoning or engineering opinion.
Official Plan
Not available: Official Plan designation not available here
Public records; not a legal, zoning or engineering opinion.
Contaminated sites
Favourable: No federal contaminated sites within 500 m
- From government records. Absence from this map doesn't mean a site is clean; get a Phase I ESA.
Source: Treasury Board of Canada Secretariat, Federal Contaminated Sites Inventory (2026-10-31). Public records; not a legal, zoning or engineering opinion.
Neighbourhood profile
Information: Median household income $65k
- Median household income (2020): $64,500
- Owner households: 12%
- Households with children: 21%
- Median age: 49.2
- Population density: 11,323 per km²
- Statistics Canada, Census of Population 2021 (income is for 2020), for the dissemination area around this address.
Source: Statistics Canada, Census of Population 2021, Census Profile and dissemination area boundaries (2022-04-27). Public records; not a legal, zoning or engineering opinion.