Instant development feasibility

225 Wallace Ave

Toronto, Ontario. What could be built here, how big, how long it takes to approve, and what the land could be worth to a builder.

Illustrative estimate from public records and your inputs. Not an appraisal, a zoning opinion, or a guarantee of approvals. LSG Realty Inc., Brokerage.

The lot

Lot area
136 m²Property report: lot area from the public parcel data
Frontage and depth
4.6 m × 29.7 mProperty report: estimated from the lot lines (not a survey)

Inside the Lansdowne station area, but the lot is small for a mid-rise building: it would need to be assembled with neighbouring lots.

One plausible scenario

Scenario 1

Keep the house and add 2 units

Keep the existing house, add a basement or in-house suite and a garden suite.

  • Added floor area65–87 m² (700–931 sq ft)
  • Units2–3 units incl. the house
  • Approval pathAs of right (zoning review and building permit)
  • Timeline3–6 months approvals + 6–12 months construction
How we estimated it
Additional units
up to 2Property report: second units and garden suites screen
Second unit
65 m²Second unit (basement or in-house) about 65 m² (typical, needs confirmation)
Rear yard
11.7 m deep, 54 m²Existing house about 12 m deep (typical, needs confirmation)
Timeline
approvals 3–6 months, construction 6–12 monthsApproval and construction months (typical, needs confirmation)

Key risks

  • Screen: Estimated lot depth under 30 m: the rear yard may be too short for a garden suite
  • Garden and laneway suites need fire access from the street and room for servicing; check both early.
Rough budget and residual land value
Toronto development charge rates

Enter your own figure. We could not verify the Altus Group 2026 Canadian Cost Guide ranges (free download at altusgroup.com/featured-insights/canadian-cost-guide); use its range for this building type in your market, or a builder's quote.

Your own estimate of what the finished space sells (or is worth) per sq ft. This public tool does not use MLS® sales data.

Design, permits, consultants, legal, insurance and marketing: commonly 15–25% of hard cost (typical, needs confirmation).

Second and third units are exempt. Rates: City of Toronto DC rates effective June 26, 2025, non-rental (singles and semis $137,846; multiples 2+ bedrooms $113,938; apartments 2+ bedrooms $80,690) · Toronto Catholic DSB education development charge, $3,893 per unit (Dec 3, 2025 to Dec 2, 2026; $4,193 from Dec 3, 2026). The TDSB levies none

Construction loan rate (typical, needs confirmation).

On average about half the cost is drawn over the build (typical).

Builder's margin on revenue: commonly 12–20% (typical, needs confirmation).

Share of gross floor area that is sellable or rentable (walls, stairs and halls excluded).

Enter a hard cost and a sale value per sq ft to see the value added.

Get a free feasibility review from an LSG land specialist

LSG Realty's parent company has 20 years of land and development work in the GTA. A land specialist will check the zoning, the numbers and the approval path with you, at no cost.

We send the specialist your contact details, this address, and the scenario summary above (not the budget figures you typed). See our privacy policy.

Illustrative estimate from public records and your inputs. Not an appraisal, a zoning opinion, or a guarantee of approvals. LSG Realty Inc., Brokerage.

See the full property report for this address · Builders and investors looking for sites like this · How this works